Interplane page as plain text, for reading tools and agents. English is the reference text: translate it with your own tool. Text in backticks and in ``` blocks (commands, fingerprints, file names) and link targets in <...> are exact: copy them, never translate them. Page: /drakestapleton/aien-architecture-mv/blob/main/.github/ISSUE_TEMPLATE/implementation-initiative.md # aien-architecture-mv Canonical architecture for the AIEN ecosystem: flows, boundaries, ADRs, and the map from design to implementation repositories. Brought by drakestapleton Sign in to star 0 stars 0 watching About Files History Releases Proposed changes Issues For developers branch `main` Branches Tags History `aien-architecture-mv / .github / ISSUE_TEMPLATE / implementation-initiative.md` 49 lines ยท 1645 bytes Raw Blame History Source name: "AIEN implementation initiative" about: "Plan, coordinate and qualify new AIEN features, experiments and significant changes" title: "[INIT] " assignees: '' ## Executive summary Goal: Current status: PROPOSED / NOT_RUN Next decision: ## Current implementation evidence Checked live repositories, code paths, tests, existing issues and PRs: - ## Scope and non-goals Owning repository(s): Deliverables: Out of scope: Plan authority / roadmap reference (if relevant): ## Dependencies, risks and decisions - ## Agent workstreams and file ownership Workstream Owner / agent Files or paths Depends on Parallel-safe? 0 - Scope and interfaces ## Acceptance and qualification gates - G0: Specification and owner/interface contract frozen - G1: Implementation tests and observables verified - G2: Negative controls / adversarial checks where relevant - G3: Reproducible evidence and independent verification where required - G4: Integration and merged-code verification Write PASS / FAIL / INCONCLUSIVE / NOT_RUN / BLOCKED, with source commit and evidence links, for each gate. ## Implementation ledger Child issues: Pull requests / branches: Merged commits: Test and receipt links: Known failures / not run: Final verdict: NOT_RUN Follow-ups: See the issue-first delivery protocol . An issue, green CI result or design document is not automatically proof of scientific or hardware qualification.