Interplane page as plain text, for reading tools and agents. English is the reference text: translate it with your own tool. Text in backticks and in ``` blocks (commands, fingerprints, file names) and link targets in <...> are exact: copy them, never translate them. Page: /drakestapleton/aien-architecture-mv/blob/main/PLAN_AUTHORITY.md # aien-architecture-mv Canonical architecture for the AIEN ecosystem: flows, boundaries, ADRs, and the map from design to implementation repositories. Brought by drakestapleton Sign in to star 0 stars 0 watching About Files History Releases Proposed changes Issues For developers branch `main` Branches Tags History `aien-architecture-mv / PLAN_AUTHORITY.md` 71 lines ยท 3785 bytes Raw Blame History Source # AIEN Plan Authority Status: AUTHORITATIVE Effective: 2026-09-27 AIEN has accumulated architecture reviews, roadmap snapshots, implementation plans, milestone plans, and research plans. They are useful historical records, but they are not allowed to compete as active instructions. ## The three whole-system authorities - Architecture: `doctrine/ARCHITECTURE.md` Defines what the system is, subsystem ownership, permanent boundaries, and canonical terminology. - Milestone registry: `doctrine/ROADMAP.md` Owns canonical milestone identifiers and milestone status. Historical milestone names remain immutable even when a subsystem is later renamed. - Execution sequence: `CURRENT_EXECUTION_PLAN.md` Defines what the project should do now and in what order. This is the only active cross-project master implementation plan. No other file may present itself as the canonical, master, final, complete, authoritative, or current whole-system plan. ## Component-local plans Component repositories may keep local roadmaps and acceptance specifications for their own scope. They must not redefine the whole-system architecture or duplicate the cross-project execution sequence. Examples: - `aien-dev/aienux/ROADMAP.md` is the Aienux component roadmap. - Omega milestone specifications define acceptance contracts for individual Omega milestones. - Historical Physics/Forge milestone specifications and receipts remain evidence records. - A finite workstream plan under `docs/plans/` is allowed only when its scope is explicit and it is marked NOT A MASTER PLAN. When a component plan conflicts with these authorities, this repository wins for architecture and cross-project sequencing. Current implementation code and evidence still win for claims about what is actually implemented. ## Historical plan archive Superseded whole-system plans live under: `docs/archive/plans/` Every archived file carries a SUPERSEDED / HISTORICAL banner. Archived files are provenance, not instructions. Agents must not: - derive current milestone status from archived plans; - reopen settled architecture because an archived document used older terminology; - treat historical PHYSICS names as a reason to undo the FORGE rename; - infer implementation status from a plan instead of current code/evidence. ## Naming rule: PHYSICS -> FORGE As of 2026-09-27, the current machine-realization subsystem is FORGE. Historical identifiers such as `PHYSICS_BOOT`, `PHYSICS_EFFECTS`, `PHYSICS_ACCELERATOR_LINK`, old receipt fields, old artifact names, and old repository history remain unchanged. They describe what existed at the time. Current architecture uses: `ATLAS AWAKENS. ALLEN INTENDS. AIEN PROPOSES. OMEGA DEFINES. FORGE REALIZES. AEGIS VERIFIES. HARDWARE ACTS. EVIDENCE TEACHES.` This sentence is responsibilities and causal dependencies, not a turn order and not the way a reaction result is accepted. FORGE is a realization and memory policy; the accept chain is World -> J-Space -> `compose.verify` -> commit -> Cortex (ADR 0016 Amendment 1, 2026-10-02). The repository `aien-spark/physics` remains a historical/current implementation location until its GitHub repository rename is performed. A repository-name transition does not rewrite old evidence. ## Change discipline A proposed change to whole-system sequencing must update `CURRENT_EXECUTION_PLAN.md`. A proposed change to subsystem responsibility must be recorded as an ADR and reflected in `doctrine/ARCHITECTURE.md`. A milestone status change must update `doctrine/ROADMAP.md` and cite evidence or an explicit corrective-reopen decision. If a new document appears to be another master plan, stop and fold the useful material into the existing authority instead.