NOT A MASTER PLAN. CURRENT_EXECUTION_PLAN.md owns sequencing and doctrine/ROADMAP.md owns milestone status. DIRAC-0 is a downstream consumer of existing workstreams, not a milestone.
Status: PROPOSED. Written 2026-10-01. Decision record: docs/adr/0023-dirac-0-program.md (PROPOSED). Specification: docs/plans/dirac/DIRAC-0-SPEC.md.
Snapshots: omega origin/main 07004a8, aien-architecture origin/main 921797b, physics origin/main 006e426.
What exists
- The operator brief of 2026-10-01 and, with this change, the draft spec, ADR and this page. All documents only.
- Pieces DIRAC-0 will consume: E1 scalar numerics (omega
#124,#127,#134,#147,#152, the last being GB10 DIV/SQRT, merged); OSC-2 items 1 to 4 (omega#148to#151); TURING yield profile and T unit; the G3 sealed-holdout commitment format (omega#122, signing with test keys#130); FORGE SUBSTRATE V2 evidence record (physics#16).
What is blocked or missing
- No complex type in Omega. M20 (
aien-spark/omega#136, draft, not qualified) has F32, F16 and BF16 only. - No GB10 tensor realization. D1B cannot start.
- ESTIMATION v4: INCONCLUSIVE (omega#153 merged 2026-10-01); v5 in progress (omega#170, open).
- G3 sealing is BLOCKED_OPERATOR, so no real sealed dataset can exist yet.
- No Physics Zero loop document and no T/J (TURING H5). D2 cannot start.
- No oracle exists. omega
research/dirac-oracle/is created by PR D-02.
Gates
DIRAC_PREP_FROZEN, DIRAC_D0_ALGEBRA_PASS, DIRAC_CPU_REALIZATION_PASS, DIRAC_D1_REALIZATION_PASS, DIRAC_D2_DISCOVERY_PASS: all NOT_RUN. No receipt exists under evidence/DIRAC-0/.
Next action
Operator review of the spec (D-01). On acceptance, D-02 (independent oracle and known-answer corpus, evaluator side only). No production runtime is touched until OSC-2 and E1 interfaces settle.
C2S reframing (2026-10-01)
The AIEN-facing ladder is now D-1 to D3 (spec section 16). D-1 waits on the Atlas C2S adequacy lab (Lane 36). D3 waits on a frozen theory and sealed novel-consequence data. All NOT_RUN.