AIEN: Make the Necessary Work the Limiting Factor

Research and execution plan • 18 October 2026 • Proposed program, not a claim of achieved performance

1. The objective

Make AIEN accomplish a defined objective with the least necessary computation, information movement, elapsed time, and energy consistent with a declared correctness contract. Explain the remaining distance from defensible mathematical and physical limits through proofs and controlled experiments.

The order of work is deliberate:

  1. Determine whether the computation is necessary at all.
  2. Replace discovery with a reusable result or a cheaper checked certificate where possible.
  3. Find a better algorithm or representation for the remaining work.
  4. Minimize communication, repeated inference, and avoidable dependencies.
  5. Execute the irreducible remainder efficiently on the actual machine.

Omeganese is available throughout this program. Its purpose is to express useful semantics, enable transformations, and carry checkable evidence. A language rewrite is justified by a demonstrated reduction in work or improvement in assurance, not by the language's name.

This plan uses “physics” to mean the scientific discipline. References to the repository named physics are only existing source dependencies; that repository does not define the scientific limits.

The operational commitment: no unexplained bottleneck is accepted as a physical limit. Every important gap receives an owner, competing explanations, a discriminating experiment, and a next-review condition. Resource limits may defer an investigation; they do not convert ignorance into a theorem.

The necessary qualification: I cannot promise that mathematics will become the only obstacle to every possible objective. Missing information, external systems, finite energy and memory, and undecidable or unresolved problems remain relevant. I can make a rigorous, progressively stronger statement for specified task families, hardware, and operating conditions. An unsuccessful search is not an impossibility proof.

2. What success means

The primary unit is a correctly completed objective, not a token. A solution that eliminates 90% of model calls can be more valuable than a kernel that generates tokens twice as fast. Percentages here illustrate the comparison; they are not forecasts.

Maintain three separate contracts:

TrackWhat must remain equivalentWhat may changeMain acceptance evidence
A: Exact executionDeclared finite semantics, outputs, traps, and permitted effectsRepresentation, schedule, storage, proven rewritesProof or bounded exhaustive verification for the supported domain; measured execution
B: Exact model inferencePinned model/runtime semantics; deterministic token sequence or target sampling distribution, explicitly distinguishedDrafting, batching, cache layout, schedulingNumerical and sequence controls; derivation of sampling correctness; statistical diagnostics are supporting evidence
C: Objective-level efficiencyAcceptance criteria and quality on the declared task distributionModel choice, amount of reasoning, symbolic methods, reusable skills, answer wordingIndependent task acceptance, paired held-out evaluation, error analysis

Track C is the main agent objective. Tracks A and B supply reliable mechanisms. A task-equivalent result must never be labeled bit-identical inference. A numerically close result is not automatically semantically identical. Distribution preservation does not imply the same sampled text for the same random seed.

Record these metrics separately:

No single weighted score replaces this table. Present a Pareto frontier: improvements in latency, cost, and quality that do not conceal regressions in the other dimensions.

3. The starting evidence

Repository inspection was read-only. No new GB10 measurements were performed for this plan. Existing receipts refer to their own commits, flags, models, and hardware conditions; they are not automatically measurements of today's default branch.

Reviewed source anchors: Omega f4a9849fb127f8d2d664dfc56890752ad180c507 and sovereign-core e6852de85dfe503347d37ed2438d1ce6f1ac8c3a, with individual historical receipts identified below. Re-pin all dependencies before executing this program.

FindingEvidenceConsequence for this program
Native decode command lists already existOmega src/omega_gpu_decode_graph.c, src/omega_gpu_cmdlist.c [G1]Use existing machinery; measure residual costs before rebuilding it
A short-context historical trace spends about 83% of its instrumented span in projections24.48 ms graph span; projections approximately 20.35 ms; recording 48.6 microseconds [G2]Projection work and weight movement dominate this case; host recording is a small opportunity
Whole-prompt prefill and graph decode already produced gainsHistorical requalification: 2,048-token TTFT approximately 32.1–32.2 s to 0.85–0.88 s; graph-on approximately 39.5–42.6 tokens/s [G3]Preserve and requalify these paths; do not count them as new proposed discoveries
Draft verification has a promising but limited resultQwen3-8B: B=2, 89.731 s to 57.358 s with identical output; larger blocks diverged; one task and one run per setting [G4]Reproduce, resolve arithmetic-path differences, and test amortization on held-out workloads
Prefetch was not an end-to-end winTwo-layer cached baseline approximately 3.95–3.98 ms versus prefetch 4.06–4.08 ms in one requalification [G5]Preserve the negative result; a new prefetch proposal must explain what changed
Reusable plans exist as a bounded host-side mechanismrx_plan.h/.c: explicit applicability predicates, candidate/verified/stale states, reference execution for candidate reuse, cost counters, fixed template capacity [G6]Extend and qualify a real starting point; do not invent a second plan cache
Typed state projection existsrx_projection.h: declared needs, derived values, recallable references, protected evidence [G7]Test whether projections are sufficient; “smallest” in a comment is not a minimality proof
Independent checking and LRAT support exist, with restricted scopechecker2, one-layer receipt specification, and c2_lrat.c [G8]Use the checker as a starting point; preserve explicit proof-domain limitations
Checked IR is not yet proof of correct executable translationReceipt classes explicitly bind executable bytes by hash without translation validation; dependency receipt resolution also remains open in v1 [G8]Close this evidence boundary before using receipts to justify broad elimination of rechecking
Omega is research-grade; general compiler and runtime qualification remain incompleteCurrent README distinguishes implemented, historical, and qualified results [G9]Build narrow, qualified slices; avoid a wholesale language migration as the first milestone

The inspected sources use “Omega,” “Omega surface language,” and “Omega Systems Core.” This plan uses the user's term Omeganese for the intended expression and execution route. Phase 0 must map that term to an exact frontend, IR, backend, and supported semantic subset. The older surface-language audit is historical and is not treated as a complete description of the current OSC compiler.

The architecture authority linked by the repositories could not be retrieved at its referenced path in this session. Therefore this is a proposed program to reconcile with that authority, not a replacement for its existing roadmap. Component owners are roles below; no individual's ownership is invented.

4. Four different kinds of limit

Limit classExampleWhat establishes itWhat does not establish it
MathematicalA task needs a certain number of queries in a stated oracle modelProof with explicit assumptions and quantifiersA slow solver, benchmark plateau, or timeout
Algorithm-specificCommunication required by a chosen computation DAG with bounded fast memoryA lower-bound argument for that DAG/modelClaiming the same bound for every equivalent algorithm
HardwareFinite transfer, issue, compute, storage, and dependency capabilitiesHardware specification plus model; calibrated measurements constrain what is attainableTreating the fastest measured run as proof of maximum capability
ImplementationRedundant work, bad layout, repeated inference, excessive barriersTraces and causal experimentsCalling software behavior a law of physics

Every bound record must include: task, input family, allowed preprocessing, storage budget, arithmetic semantics, error tolerance, machine assumptions, cold/warm state, proof or source, and conditions that invalidate the bound.

For a specified algorithm and machine, a coarse lower bound on latency can take the form:

T_actual >= T_lower = max(Q_min / B_cap, F_min / P_cap, L_critical, T_mandatory_external)

Here Q_min and F_min must actually be necessary under the stated assumptions; B_cap and P_cap must be appropriate upper capacities for the relevant operations and transfers. Taking a maximum handles potential overlap; adding everything would double-count it. Tighter bounds must model serial stages and shared-resource contention. LPDDR reads and writes, for example, cannot independently consume the same total bandwidth budget.

Measured sustainable microbenchmarks are attained reference performance, not proofs of upper capacity. Keep a separate engineering model using those references. A gap to an attainable reference is actionable; a gap to a weak mathematical bound may simply expose that the bound is weak. Neither is “percentage of physics” without qualification.

The earlier estimate of approximately 82 tokens/sec used 3.34 GB of nominal projection weights divided into a 273 GB/s hardware specification. It is a conditional, optimistic weight-streaming estimate for one-token execution, excluding other costs. It is not a universal speed limit. Weight reuse, compression, different precision contracts, and fewer required model calls all challenge its assumptions. [G2, H1]

Do not begin with Landauer-scale limits or raw advertised AI FLOPS. Such quantities do not yet give a useful tight bound on this agent's task latency. Begin with a defined task, its necessary information, and the machine's actual execution and communication constraints.

5. Mathematical work reduction comes first

5.1 Separate finding from checking

Use expensive search, learned reasoning, or external mathematics to propose a result. Ask a smaller independent checker to validate the result against an explicit specification. Preserve the accepted result, its assumptions, and the evidence needed for reuse.

This does not make every problem cheap. Proof search may be hard; certificates may be large; checking may be expensive; and the formal specification may omit what the user actually intended. Measure all four. A checked proof establishes its formal statement, not the accuracy of an informal translation or the truth of unchecked environmental facts.

Start with three CPU-sized domains:

DomainExpensive work to challengeCheap evidence to investigateImportant limitation
Bounded integer/bit-vector kernelsRepeated evaluation or repeated proof searchRewrite derivation, exhaustive small-domain check, restricted SAT certificateOverflow, signedness, traps, and preconditions are part of semantics
Repeated dependency-constrained plansSearching the same arrangements or workflows repeatedlyApplicability predicates plus postcondition checkingA previously valid plan can become invalid when state or authority changes
Structured mathematical objectivesLong natural-language reasoning for arithmetic, identities, or finite constraintsExact arithmetic witness, symbolic derivation, or solver certificateA substitution check proves a candidate satisfies an equation, not uniqueness or completeness

Illustrative research exercise: a loop computing an integer sum may be replaceable by a closed form. The proof must include range and overflow behavior; an algebraic identity over integers does not automatically preserve a finite-width implementation. Compare operation count, proof cost, and actual execution. This is an example to formalize, not an assertion about an existing AIEN kernel.

5.2 Reuse knowledge under explicit assumptions

Create a reusable result record containing:

Hash identity is a binding mechanism. It is not proof that two arbitrary programs mean the same thing. Canonicalization recognizes the equivalences it implements; general program equivalence is not solved by hashing.

For one candidate shortcut, with a baseline per-use cost C_b, one-time discovery/validation cost C_s, and actual per-use shortcut cost C_r including lookup, checks, execution, and expected fallback:

N_break_even > C_s / (C_b - C_r), provided C_b > C_r.

If the denominator is nonpositive, the shortcut does not pay back under that workload. Report separate time and energy break-even points. Include failed candidate discovery in the campaign total, and avoid assuming an infinite future reuse count.

5.3 Search for equivalent formulations

Explore algebraic rewrites, constant propagation, partial evaluation, common subexpressions, loop invariants, sufficient statistics, incremental updates, and specialized domain algorithms. Equality saturation is a candidate technique, not an obligatory new dependency. Its extracted expression is optimal only relative to the explored equivalences and cost model; it is not globally optimal mathematics. [R3, D2]

Every rewrite needs a checked semantic domain. Real-number associativity cannot justify reordering floating-point sums while claiming bitwise equivalence. Preserve effects, exceptions, NaNs, signed zero, rounding, and aliasing where applicable. If a relaxed numerical contract is useful, open a separate evaluation track.

Use manual derivation first when it can eliminate an entire computation. Then bounded CPU search. Use the GPU only when the question is about GPU behavior or the smaller methods have a documented limitation.

6. The experimental program

These are proposed experiments, not completed work. Every row becomes a project item with the experiment record in section 10. The owner codes are defined in section 12. Promote only after the common correctness and measurement gates in section 9.

ID / priorityHypothesis and predicted observationDiscriminating experiment and controlsDecision / deliverableOwner
E01 / P0Significant objective time is repeated discovery or unnecessary model invocationTrace complete objectives; replace model calls with recorded outputs in a local replay solely to bound possible savings; retain real quality evaluation separatelyCost inventory and causal upper opportunity estimate, not a deployable replay resultEXP + AGENT
E02 / P0A CPU checker can validate selected mathematical outputs more cheaply than another model passCompare model self-check, exact direct computation, and candidate-plus-certificate; include wrong witnesses, malformed proofs, and specification variantsPer-domain checker cost, acceptance limits, and a decision whether certificates are actually worthwhileMATH
E03 / P0Existing plan reuse removes repeated search with lower total costCold solve, warm same-instance, new bindings, and changed preconditions; compare against existing rx_plan baseline; count retrieval and validationHeld-out reuse benefit and invalidation coverage; no general-agent claim from a toy domainAGENT
E04 / P0Some repeated computations have provably cheaper formulationsManually derive and independently check 3–5 hot pure operations; benchmark original and transformed versions over boundary inputsSmall library of checked reductions with operation counts and exact domainsMATH + OMEGA
E05 / P0Current IR evidence is insufficient to trust executable substitutionCorrupt native instructions while keeping valid IR; build translation-validation slice for a small supported instruction subset; unsupported constructs refuseChecked relation between IR and executable for that subset; remaining unsupported scope explicitOMEGA + REVIEW
E06 / P1Bounded rewrite search finds reductions missed manuallyFixed CPU budgets; compare manual rules, greedy rewrites, and bounded equality exploration; proof-check each accepted derivationNet savings including search; rewrite set and counterexamples; no “optimal” label on timeoutMATH + OMEGA
E07 / P1Typed projections reduce reasoning inputs without losing needed factsCompare full state, declared projections, and projections with recall; plant required facts outside naive summaries; vary state after cachingSufficiency failures, recall overhead, reduced input bytes/tokens, and objective qualityAGENT
E08 / P1Incremental verification can avoid checking unchanged dependenciesChange one dependency at a time; compare full recheck with dependency-indexed recheck; include hidden/stale dependency mutantsProof of invalidation rules for supported structures plus measured cost benefitMATH + AGENT
E09 / P0The performance apparatus can distinguish host time, device time, and observer effectsNull kernels, dependent/independent chains, timestamp-on/off, known sleeps/work, cold/warm runsClock/measurement calibration and uncertainty; reject inconsistent timelinesEXP + GPU
E10 / P0Projection kernels leave an identifiable gap to attainable native memory throughputRead-only streaming, gather, read/write, and dependency microbenchmarks using actual mappings; sweep size across caches and production shapesHardware reference atlas with conditions; no claim of absolute maximumGPU
E11 / P1FP8 load scheduling, conversion, or occupancy explains the projection gapIsolate load-only, conversion-only, reduction-only and full kernels; sweep variant 1/2, block shape and registers; preserve operation orderPer-shape dispatch only where full-model uninstrumented latency improvesGPU
E12 / P1Uncached intermediates or excessive synchronization cause avoidable trafficSeparate GPU-only scratch from host mailboxes; compare visibility-correct barrier variants; run stale-data mutants and repeated stressQualified memory/barrier contract; retain baseline if coherence or net benefit failsGPU + OMEGA
E13 / P1Selected fusion removes traffic and launches without harmful occupancy lossCandidate gate/up+SwiGLU or residual+consumer versus existing chain; include register and full-step measurementsKeep only end-to-end winners; existing combine+norm fusion is baselineGPU
E14 / P1Multi-token verification reuses weight traffic enough to outweigh rejected workReproduce B=2 result; test larger blocks after arithmetic-path investigation; compare draft strategies, no-draft control, and adaptive depthAccepted tokens/ms including draft, validation, rollback and KV repair; qualify each model separatelyGPU + AGENT
E15 / P1TTFT can fall through reuse or reduced prefill workCold/warm/prefix-hit/miss matrix, short and long prompts; profile routing, prefill, initial head and startup separatelyTTFT frontier with explicit numerical contract and tail-latency limitsGPU + AGENT
E16 / P2Repeated tool workflows need fewer model round-tripsCompile one pure/read-only workflow into checked transitions; compare against per-step model control; test changed schemas and unexpected observationsObjective latency and model calls including fallback; fresh checks before effectsAGENT
E17 / P2Specified compression reduces total cost after decode/check overheadTest lossless representations or proven task-specific summaries first; include entropy/incompressible controls and decompression trafficNet latency/energy benefit and explicit semantics; lossy methods remain Track CMATH + GPU
E18 / P2Hardware-tailored superoptimization helps a small recurring kernelSearch a bounded instruction space on CPU, verify candidates, run a small shortlisted set on chipSearch-space-specific best result and amortization; no unrestricted optimality claimOMEGA + GPU
E19 / P0 recurringProposed bottleneck explanations predict behavior outside the fitted casePredict effects of size, context, cache, dependency, or supported clock changes; test unseen conditionsExplanation retained, narrowed, or falsified; residual stays openEXP + REVIEW
E20 / P0 releaseCombined improvements improve objectives rather than isolated demosFrozen held-out objective suite, ablations, cold/warm results, sustained thermal run and deliberate failure pathsReproducible release dossier and rollback decisionEXP + REVIEW

Run E02–E04 before committing to large new compiler machinery. Run E09–E10 before a broad kernel search. E05 gates trusted executable substitution, but need not block mathematical exploration or untrusted candidate generation. E14 depends on a sound inference contract, not merely faster matrix operations. E20 requires both the work-reduction and execution tracks to be evaluated together.

The prefetch hypothesis has a recorded negative result [G5]. It does not disappear from the ledger. Reopen it only with a specific changed premise, such as a different overlap schedule or cache residency, and predict why the outcome should change.

7. Omeganese's role and the proof boundary

Use the existing Omega plan and projection mechanisms wherever they fit. Treat source syntax as replaceable. The semantic contract, proof obligations, and measured behavior are the durable artifacts.

The first useful slice should carry:

  1. A typed pure operation or bounded plan with explicit preconditions and postconditions.
  2. A semantics version covering integers, floating point where supported, traps, memory, and effects.
  3. An untrusted producer of rewrites, proofs, or specialized realizations.
  4. An independent checker of the exact claimed relation.
  5. Binding of checked inputs, dependencies, proof, executable, target, and checker version.
  6. A runtime applicability check and a correct fallback.

There are distinct proof obligations:

BoundaryRequired claimCurrent planning treatment
Objective to formal statementThe specification captures what counts as successDomain-specific review and independent acceptance; not assumed solved by the compiler
Original expression to transformed expressionEquivalent under named preconditions and finite semanticsSmall checked rewrite system first
IR to machine codeExecutable implements the checked IRExplicit missing translation-validation work, scoped by E05
Plan to current worldPreconditions and dependencies still holdExisting plan applicability machinery; stress and extend its scope
Certificate to declared propertyChecker validates the property actually claimedKeep current restricted LRAT scope visible; do not relabel no-trap as functional correctness
Completed workflow to accepted objectiveObservable postconditions holdIndependent final verifier; successful termination alone is insufficient

The current receipt specification's class 2 proves a restricted no-trap property under requires clauses, not arbitrary program equivalence. Its bit-blaster refuses unsupported operations, and its LRAT checker supports a restricted proof form. Reuse that discipline rather than widening claims silently. A signature proves provenance, not correctness. [G8]

Proof discovery may remain untrusted. The checker must be versioned, reviewed, tested with deliberately invalid proofs, and small enough to inspect. Minimize shared implementation between producer and checker, but acknowledge shared semantics and formalization errors. A correct checker for an incorrect statement still checks the wrong thing.

8. Workloads and controls

Build a versioned suite around real objectives before tuning. Use synthetic cases to isolate causes, not to replace objective-level evaluation.

FamilyInitial casesRequired partitions
Formal CPU tasksBounded arithmetic transformations, finite constraints, plan applicabilitySmall exhaustive domains; larger boundary and random cases; valid/invalid certificates
Repeated objectivesSame plan with new inputs; cached result; state change; stale dependencyFirst occurrence, useful repeat, false match, miss, invalidated entry
InferenceCurrent 8B dense and 30B MoE paths, separatelyGreedy/sampled; 1, 20, 512, 2,048-token prompts initially; longer supported contexts later; short/long generation
Agent tasksRead-only repository query, structured data transformation, bounded planning, tool workflow, a task needing new evidenceFamiliar task family, unseen instances, genuinely novel objective, ambiguous or unanswerable case
System behaviorStartup, concurrency, interruptions, cache pressure, long thermal runIdle exclusive device versus controlled contention; warm versus cold; queue-inclusive latency

Use a development partition for tuning and a frozen held-out partition for decisions. Split repeated-task families so that exact answer memorization is visible rather than mistaken for generalization. Report warm reuse explicitly; it is a legitimate gain when the workload really repeats.

Task-level quality needs a specified noninferiority margin and confidence procedure before the campaign. Exact domains permit no observed mismatch and require the promised formal evidence. Statistical tests do not prove zero error or exact distribution identity. For open-ended objectives, state the evaluator's uncertainty and retain manual review of disagreements.

9. Measurement and promotion gates

Gate G0 — Reproducible baseline. Pin source, dependency locks, executable and model hashes, input set, device/firmware/driver, memory mode, precision, flags, clocks, power mode, and temperature. Native execution must be positively identified. Historical or dirty-tree receipts are preserved but not relabeled as clean candidate qualification.

Gate G1 — Trustworthy measurements. Calibrate CPU/GPU timestamp relationships where cross-domain timing is used. Measure tracing overhead. Pair diagnostic runs with uninstrumented outcome runs. Record whether profiling changes caches, clocks, replay, or serialization. Context7's NVIDIA documentation explicitly identifies these interventions [D1]. Nsight compatibility with the native submission path is unverified; use existing native timestamps and controlled experiments if unsupported. Lack of counters leaves uncertainty, not permission to invent them.

Gate G2 — Correctness. Apply the selected Track A/B/C contract. Include mutated proofs, stale cached inputs, wrong model/tokenizer identities, altered code bytes, numerical boundary cases, invalid effect ordering, and omitted dependencies. A faster incorrect candidate is a failed experiment.

Gate G3 — Detectable benefit. Start with a short pilot to estimate variance. Predeclare minimum worthwhile effect, repetition count or sequential stopping rule, and confidence method. Interleave A/B order and randomize where appropriate. Use independent request/run units; adjacent tokens within one run are not independent repetitions. For p95, collect enough requests to estimate its uncertainty rather than quoting a handful of samples.

Gate G4 — Full cost. Include compilation, search, proof generation/checking, data preparation, retries, misses, fallback, and amortization. Report CPU and GPU work even if one is hidden behind the other. Concurrency can reduce wall time while increasing total energy; show both.

Gate G5 — Causal explanation. The proposed mechanism must predict an unseen perturbation, such as working-set scaling or dependency-chain sensitivity. A curve fit to the original trace is not enough. Negative residuals or faster-than-bound results trigger a measurement or bound audit.

Gate G6 — Independent reproduction and integration. A second reviewer reproduces the result from preserved inputs and commands. Full-agent evaluation and sustained runs pass. Promote through the project's normal review and candidate process; retain an immediate fallback to the last qualified realization.

No arbitrary percentage is called the physical limit. A scoped “near the limit” claim requires a defensible bound, a measured interval, an uncertainty budget, and a statement of all excluded alternatives. A plateau is recorded as “best observed under this search budget.”

10. The evidence ledger

Use one append-only record per experiment. The following is a proposed schema, not an assertion that it is implemented:

experiment_id / parent_id / owner / reviewer / date
objective_family / contract_track / exact_semantics_version
source_pins / executable_hash / model_hash / checker_identity
hypothesis / competing_explanations / predicted_measurements
bound_id / proof_assumptions / invalidation_conditions
baseline / intervention / controls / workload_partition
hardware_state / cache_state / instrumentation_state
budget: person_hours, cpu_hours, gpu_hours, storage, search_nodes
measurement_protocol / uncertainty_method / stopping_rule
raw_receipts / commands / outputs / negative_controls
discovery_cost / verification_cost / execution_cost / reuse_count
result: PASS, FAIL, NOT_RUN, BLOCKED_HARDWARE,
        BLOCKED_OPERATOR, MISSING_IMPLEMENTATION
claim_strength: proven_in_scope, measured, inferred, unresolved
remaining_gap / next_discriminating_experiment / revisit_trigger

Keep the repository's result vocabulary and add claim strength as a separate field. A PASS means the declared experiment gate passed, not that a global optimum was proved.

The program dashboard needs five views: objective quality/cost frontier; cold/warm timing; work eliminated; hardware execution gap; and unresolved explanations. The last view is a first-class deliverable.

When an explanation fails:

  1. Preserve the failed prediction and raw receipts.
  2. Audit measurement and correctness first.
  3. Challenge the algorithm's unnecessary-work assumptions.
  4. Search literature, existing source, and alternative formulations.
  5. Construct the smallest example that separates the remaining explanations.
  6. If blocked, name the missing observation or capability and set a revisit trigger.

Deferral is allowed; “physically impossible” requires stronger evidence. An unresolved gap is a research obligation, not proof that a particular compression exists.

11. A phased delivery plan

Indicative duration: a first 12-week campaign with four contributor roles and independent review availability. This is a planning envelope, not a forecast that mathematical discoveries will arrive on schedule. With fewer contributors, retain gate order and reduce concurrent experiments. Weeks are relative to program start.

PhaseWindowWork and concrete deliverablesExit gate
0: Define and reproduceWeek 1Contract tracks; 3 CPU objective families; initial agent/inference suite; pins and apparatus check; map Omeganese/OSC surfaces; reconcile authoritative roadmapG0, initial G1; every baseline status explicit
1: Remove work cheaplyWeeks 2–3E01–E04; checked arithmetic example, plan-reuse campaign, certificate-vs-direct-evaluation comparison; first break-even ledgerAt least one defensible reduction or a falsified hypothesis with a decisive next experiment; no forced success quota
2: Establish trustworthy substitutionWeeks 3–6E05–E08; narrow translation-validation slice; checked rewrite set; reuse invalidation; projection sufficiency evaluationG2 and G4 for supported substitutions; unsupported cases use baseline
3: Explain hardware gapsWeeks 2–6, alongside CPU workE09–E13; native hardware atlas; component attribution; shortlisted load/layout/fusion experimentsG1, G3, G5 for each retained kernel change
4: Reduce necessary model passesWeeks 6–9E14–E17; exact draft verification qualification; TTFT/cache campaign; one reusable read-only tool workflowModel-specific correctness; objective-level benefit including cold costs and fallback
5: Integrate and challengeWeeks 10–12E18 only if reuse economics justify it; E19/E20; ablations; independent rerun; unresolved-gap reviewG6 and a scoped release dossier; no universal-optimality claim
Continuing researchAfter first campaignReopen unresolved gaps with new evidence; broaden verified semantic and task coverageEach extension earns its own evidence

Critical dependencies: contract and baseline before optimization claims; semantics and translation evidence before trusted executable reuse; measurement calibration before hardware attribution; arithmetic consistency before exact larger-block verification; full objective suite before promotion.

12. Ownership, resources, and work allocation

RoleAccountability
MATH: algorithms/formal-methods leadNecessary-work arguments, rewrites, certificates, proof assumptions, counterexamples
OMEGA: compiler/runtime leadOmeganese semantic slice, realization binding, translation validation, integration with existing IRs
GPU: performance leadNative apparatus, memory/compute experiments, kernel correctness and sustained execution
AGENT: objective/runtime leadPlan reuse, state projection, tool workflows, end-to-end acceptance and quality
EXP: experimental ownerWorkload design, statistical protocol, reproducibility, ledger and gap accounting; may be shared with a contributor
REVIEW: independent reviewerChallenge specifications, reproduce selected results, review evidence before promotion

One person may cover multiple roles, but a candidate's author should not be its sole acceptance reviewer. Named assignments must come from the actual team.

Use existing hardware first: ordinary CPU host for proofs and small searches; the existing GB10 for questions requiring that device. No new hardware purchase is justified by this plan alone. No production Python or CUDA dependency is proposed; existing repository constraints remain in place. External research tools supply ideas or offline evidence, not an automatic runtime dependency.

Initial allocation proposal: 50% contributor effort on work elimination and semantic assurance, 25% on measurement and hardware, 25% on integration and independent replication. Reallocate based on measured objective cost, not attachment to a track.

Book exclusive GB10 experiment slots; do not compare uncontrolled concurrent jobs. Preserve native-job operational rules and do not kill chip jobs mid-run. Budget each campaign after a pilot in CPU/GPU hours and storage; do not invent a monetary forecast without actual labor and energy rates.

Weekly review: one page per active hypothesis showing prediction, observation, total cost, and next discriminator. Every two weeks choose work by expected objective benefit, uncertainty reduced, and experiment cost. A negative result that rules out an expensive direction is a valid delivery.

13. First ten working days

DayActionReviewable output
1Freeze the three equivalence tracks, primary objective families, and current candidate pinsSigned-off experiment charter and baseline inventory
2Audit existing plan cache, projection, checker, and inference seams; map source to actual serving pathsImplemented/integrated/qualified matrix; missing boundaries named
3Trace a small real-objective sample; record model calls and repeated workCost ledger with no speedup claim
4Derive 3–5 candidate work reductions manually; specify their domains and counterexamplesProof sketches and independent checking plan
5Run CPU comparisons: direct solve, certificate check, cached reuse; include invalid inputsE02–E04 pilot receipts and break-even estimates
6Calibrate native timers and observer overhead; reproduce one historical inference baselineE09 apparatus report and old/new comparison
7Measure native streaming and dependency baselines with production memory modesE10 first hardware reference atlas
8Select one work-reduction candidate and one hardware hypothesis by predicted valueTwo preregistered confirmatory experiments
9Run independent controls and held-out cases; identify translation evidence needed for promotionCorrectness and uncertainty report
10Review results, including failures; assign the next two-week campaignInitial decision record and unresolved-gap ledger

Do not spend these ten days rewriting the stack. The output is evidence about which work should disappear and which physical resource actually limits the remainder.

14. Risks that can invalidate the program's conclusions

RiskPrevention and required response
Checking the wrong formal statementIndependently review objective-to-specification mapping; retain observable acceptance tests
Proof search costs more than it savesMeasure discovery and failures; enforce search budgets and realistic reuse break-even
“Verified” means a test passed onceLabel proof scope, empirical checks, and reference comparison distinctly
Canonical identity mistaken for semantic equivalenceRequire a checked relation for transformations; hash only binds declared objects
Warm cache mistaken for general reasoningSeparate cold, repeat, novel, and invalidated cases
Floating-point transformations change decisionsKeep exact and relaxed tracks separate; test near-ties and row-count changes
Overfitted kernel tuningHold out shapes/contexts and repeat complete objective runs
Double-counted timing savingsModel overlap and shared resources; use critical-path measurements
Profiler changes the workloadInstrumentation ablation; uninstrumented acceptance runs
New model/smaller precision silently changes taskRequalify Track C quality; do not inherit Track B claims
Faster local compute hides remote waitsReport external latency separately; reduce avoidable round-trips without claiming control of the remote service
Infinite search disguised as rigorKeep unresolved status and a budgeted next experiment; stopping a campaign is not proving a limit
Evidence or applicability checks removed for speedOptimize or amortize valid checks; preserve freshness and effect semantics

15. The final campaign deliverable

A complete first-campaign result contains:

The claim this earns is specific: for these objectives, these semantics, and this machine, I have removed the demonstrated unnecessary work and can explain the remaining measured costs to the stated uncertainty. Where I cannot explain them, the research remains open.

16. Research grounding and source register

Research was located through Undermind, with current tool documentation checked through Context7. Full-text sections of the LRAT and speculative-decoding papers were opened; other entries were reviewed through abstracts/metadata or primary documentation. This is a targeted foundation for the project, not an exhaustive literature survey or replication of the papers. Published speedups are not forecasts for AIEN. The recent PreAct result is supporting motivation only; its abstract was reviewed, not its full evaluation.

GitHub evidence

Research and documentation

Research workspace: AIEN — Mathematical Work Reduction and Physical Limits.