Interplane page as plain text, for reading tools and agents. English is the reference text: translate it with your own tool. Text in backticks and in ``` blocks (commands, fingerprints, file names) and link targets in <...> are exact: copy them, never translate them. Page: /drakestapleton/aien-architecture-mv/blob/main/funding/tais-2026-memory-safety/BUDGET.md # aien-architecture-mv Canonical architecture for the AIEN ecosystem: flows, boundaries, ADRs, and the map from design to implementation repositories. Brought by drakestapleton Sign in to star 0 stars 0 watching About Files History Releases Proposed changes Issues For developers branch `main` Branches Tags History `aien-architecture-mv / funding / tais-2026-memory-safety / BUDGET.md` 95 lines · 8341 bytes Raw Blame History Source # Full program budget — AIEN Omega memory-safety research Status: UNFUNDED PLANNING PROPOSAL (2026-10-27). USD. All rates are illustrative unquoted estimates, not vendor-confirmed offers, staffing commitments or money already spent. Minimum viable funding $250,000, total proposed 24-month program $10,000,000. This document matches the machine-readable budget.json . ## Expenditure allocation by research milestone Tranche Personnel Hardware Independent audits Infrastructure Contingency Incremental Cumulative M1 — Months 0-3 $150,000 $35,000 $35,000 $15,000 $15,000 $250,000 $250,000 M2 — Months 4-6 $500,000 $115,000 $65,000 $45,000 $25,000 $750,000 $1,000,000 M3 — Months 7-12 $1,950,000 $350,000 $280,000 $250,000 $170,000 $3,000,000 $4,000,000 M4 — Months 13-24 $3,990,000 $735,000 $540,000 $435,000 $300,000 $6,000,000 $10,000,000 Total $6,590,000 $1,235,000 $920,000 $745,000 $510,000 $10,000,000 $10,000,000 The $250K, $1M, $4M, and $10M figures are cumulative targets; the increments are respectively $250K, $750K, $3M, and $6M. They must not be added as if they were independent awards. No tranche is unlocked automatically. ## Detailed line items ### personnel — $6,590,000 Line item Quantity Unit planning allowance Extended cost Purpose Programming language/formal verification specialists 110 person-month $18,000 $1,980,000 Typed memory model, compiler verification, constrained source translation GPU compiler and runtime systems engineers 104 person-month $15,000 $1,560,000 CUDApp, CPU/GPU ownership, buffers and cross-vendor validation AI agent security/adversarial researchers 60 person-month $16,000 $960,000 Tool containment, fault injection, isolation and threat models Framework integration and test engineers 52 person-month $15,000 $780,000 GGML, PyTorch, numerical and memory regression comparisons OSS maintenance, release and CI engineers 42 person-month $15,000 $630,000 Reproducible release process and upstream interoperability Program management and research operations 28 person-month $15,000 $420,000 Procurement, fiscal control, open reporting Independent research fellowships 26 person-month $10,000 $260,000 Replication and specialized methods Subtotal $6,590,000 ### hardware — $1,235,000 Line item Quantity Unit planning allowance Extended cost Purpose Additional DGX Sparks 10 system $5,000 $50,000 Three initial Sparks proposed; independent reproduction and destructive tests Discrete NVIDIA GPU development systems 12 system $9,000 $108,000 Separate CPU/device address spaces and driver coverage Data-center NVIDIA accelerator host allowances 4 system $75,000 $300,000 Multi-GPU isolation, subject to target support and utilization AMD CPU and ROCm-oriented GPU workstations 12 system $10,000 $120,000 AMD heterogeneous memory, driver and porting tests AMD high-memory server configurations 4 system $35,000 $140,000 Large workloads and memory pressure tests Intel discrete GPU workstations 10 system $7,000 $70,000 Intel memory mapping and runtime semantics Intel accelerator server allowances 4 system $40,000 $160,000 Larger target experiments contingent on compatibility Shared storage, racks, network, RAM, CI servers 1 lot $140,000 $140,000 Lab orchestration and durable reproducibility Power, thermal, UPS, measurement and fault-injection tools 1 lot $70,000 $70,000 Adversarial hardware testing and reliable energy readings Spares, shipping, maintenance pool 1 lot $77,000 $77,000 Availability, repairs and replacements Subtotal $1,235,000 ### audits — $920,000 Line item Quantity Unit planning allowance Extended cost Purpose Formal-methods proof audits 8 review $50,000 $400,000 External proof and trusted-computing-base scrutiny Adversarial security/red-team audits 6 review $50,000 $300,000 Attempt to break host/GPU/agent protections Driver/runtime binary and source audits 4 review $30,000 $120,000 Unsafe interfaces, memory protection and firmware boundaries Independent experiment replication awards 5 award $20,000 $100,000 External reproduction or falsification Subtotal $920,000 ### infrastructure — $745,000 Line item Quantity Unit planning allowance Extended cost Purpose Rented GPU compute and experiments 24 month $13,000 $312,000 Flexible capacity where buying hardware is premature Power, networking and hosting 24 month $7,000 $168,000 Running the test lab CI artifact storage, provenance and secure observability 24 month $5,000 $120,000 Source/build/evidence retention Research workshops and upstream collaboration 24 month $3,000 $72,000 Cross-project verification and dissemination Compliance, publication, essential services 1 lot $73,000 $73,000 Grant and research operations Subtotal $745,000 ### contingency — $510,000 Line item Quantity Unit planning allowance Extended cost Purpose Controlled reserve 1 lot $510,000 $510,000 Disbursed only with transparent approvals Subtotal $510,000 ## Staffing and pricing assumptions The projected total covers 422 fully loaded researcher/engineer person-months, equivalent to 17.6 average full-time positions over 24 months if the complete program is funded, with hiring staged to actual awards. Monthly allowances are placeholders including benefits, contracting cost and overhead where relevant. No named institution, external reviewer or qualified researcher is represented as already engaged. Quotes, ranges and contractual costs must replace these allowances before binding commitments. ## First 90 days: minimum $250,000 - $150,000 personnel: compiler/systems capability audit, memory-safety threat model, safe subset definition, adversarial C corpus, and experiment design. - $35,000 hardware: proposed purchase of 3 DGX Sparks at $5,000 each ($15K), 1 AMD CPU/ROCm GPU workstation ($10K), 1 Intel GPU workstation ($7K), and first instrumentation ($3K). Every amount here is a planning allowance subject to real quotes. Existing personal Spark is excluded; all initial purchases count within the larger hardware budget. - $35,000 audits: independent, paid security/semantics review without conflict of interest. - $15,000 infrastructure: independent build runners, evidence receipts, secure storage. - $15,000 controlled reserve: cannot be silently spent outside approved scope. ## Procurement decisions The hardware allocation funds research only when an associated test plan exists. More Sparks allow replication and disruptive GPU reset tests. Discrete NVIDIA tests address memory-model assumptions that GB10 unified memory alone cannot answer. AMD and Intel are new port targets requiring development; buying the devices does not make the current GB10 CUDApp runtime compatible. Data-center-class units are ceilings conditional on confirmed software feasibility, quotations and expected use; rent or defer when sensible. Report dated SKU quotes, quantities, taxes, warranty, power and safety requirements before ordering. ## Independent accountability Publish monthly allocation-vs-paid ledgers, hardware assets, audit scopes, source SHAs, failure logs and qualification receipts. Large hardware and personnel decisions require reviewer/fiscal approval under governance . The full research program is described in RESEARCH-PLAN.md . Estimates will change as engineering evidence, procurement and reviewer availability improve; every such change must update this table and budget.json together.