Interplane page as plain text, for reading tools and agents. English is the reference text: translate it with your own tool. Text in backticks and in ``` blocks (commands, fingerprints, file names) and link targets in <...> are exact: copy them, never translate them. Page: /drakestapleton/aien-architecture-mv/blob/main/funding/tais-2026-memory-safety/GOVERNANCE.md # aien-architecture-mv Canonical architecture for the AIEN ecosystem: flows, boundaries, ADRs, and the map from design to implementation repositories. Brought by drakestapleton Sign in to star 0 stars 0 watching About Files History Releases Proposed changes Issues For developers branch `main` Branches Tags History `aien-architecture-mv / funding / tais-2026-memory-safety / GOVERNANCE.md` 32 lines · 3329 bytes Raw Blame History Rendered 1 # Grant controls, source evidence and financial reporting 2 3 This research program is an **unfunded proposal**. No Manifund grant or outside funding is claimed by these files. No external research institution, security firm, named auditor or supplier has agreed to participate. 4 5 ## Stage-gated funding 6 7 - **M1 $250K cumulative:** scoped proof and security foundations, independent assessment and first hardware lab. 8 - **M2 $1M cumulative:** only after evidence for M1, add $750K for new C frontend and safe-profile verification. 9 - **M3 $4M cumulative:** only after M2 acceptance, add $3M for scaled team, cross-vendor CI and external validation. 10 - **M4 $10M cumulative:** only after M3 acceptance, add $6M for maintenance, proofs, research infrastructure and broader integration. 11 12 Actual releases follow donors' and grant administrators' contracts; GitHub commits never authorize external spending by themselves. 13 14 ## Procurement and fiscal controls 15 16 Before purchasing: publish item rationale, measured research need, exact device SKU, **dated written quote**, supplier, warranty, power, shipping/tax, driver availability, alternatives including cloud rental, expected utilization and approved budget phase. Independent large-purchase approvals require at least two authorized humans once governance is constituted. Keep a private original invoice; publish safe accounting totals and equipment inventory IDs without exposing card, bank, address or security details. 17 18 Each month report **budget / approved / committed / invoiced / paid / refundable**, funding sources, equipment inventory, payroll burn, deliverables and risks. Preserve receipts; move dollar amounts out of the contingency category only with public variance notes and approval under grant terms. Plan lines remain **PROPOSED / not quoted** until updated. 19 20 ## Research controls 21 22 - Independent adversarial review of AI-assisted code and any claimed formal theorem. 23 - Qualified compiler receipts state exact property and trusted computing base, unsupported external pointers, C UB boundaries, GPU firmware limits and residual timing/race/resource risks. 24 - Mutant and fault-injection controls must be detected. Publish all failed and NOT_RUN tests. 25 - Memory bugs relevant to active exploitation follow coordinated security disclosure; high-level funding reports remain public. 26 - Release hardware and model benchmarks with same-model/precision comparator, raw commands, driver revisions, timing/energy methods, CPU fallback counters and variance. 27 28 ## Budget change procedure 29 30 [budget.json](budget.json) contains authoritative numeric allocations. [BUDGET.md](BUDGET.md) carries the same numbers with purpose and procurement context. A PR changing one must update the other and include tested sum checks: (1) line item quantities × rates sum to category totals; (2) each category total equals that category's sum across four tranches; (3) tranches total **$10M**, with cumulative 250K / 1M / 4M / 10M. Publish the reason for every revision and the impact on research gates and cash runway. 31 32 This public research and budget directory is stewarded in [aien-architecture-mv](https://github.com/aien-dev/aien-architecture-mv), which coordinates the multi-repository plan. It is not a substitute for an approved fiscal sponsor, donor agreement or nonprofit compliance review.