Interplane page as plain text, for reading tools and agents. English is the reference text: translate it with your own tool. Text in backticks and in ``` blocks (commands, fingerprints, file names) and link targets in <...> are exact: copy them, never translate them. Page: /drakestapleton/aien-architecture-mv/issues/5afcf2f66d7c282b # aien-architecture-mv Canonical architecture for the AIEN ecosystem: flows, boundaries, ADRs, and the map from design to implementation repositories. Brought by drakestapleton Sign in to star 0 stars 0 watching About Files History Releases Proposed changes Issues For developers # Phase 0: define and reproduce (contracts, pins, three CPU objective families, apparatus check) Open · #264 · open 2026-10-18 19:02 UTC Imported from GitHub aien-dev/aien-architecture-mv#264, by drakestapleton Labels: ready-for-agent drakestapleton wrote on 2026-10-18 19:02 UTC Part of the necessary-work programme. Plan sections 11 (Phase 0) and 13. Status: NOT_RUN. Docs: plan , feasibility research . In plain words: before any experiment, write down exactly what "the same answer" means on each track, pin every source and model, pick three small CPU task families, and prove the measuring tools tell the truth. Deliverables (each one reviewable on its own): - The three equivalence tracks frozen: A exact execution, B exact model inference (deterministic sequence versus target distribution, stated separately), C objective-level efficiency with Turing yield T and T/J as the primary figure once TY-x exists. - Three CPU objective families with partitions: bounded arithmetic transformations, finite constraints, plan applicability (plan section 8). A development partition and a frozen held-out partition. - Candidate pins: omega-mv main `f4a9849f` (identical to the plan's pin on 2026-10-18), aien-sovereign-core-mv main `1db20d44` (one CI-only commit after the plan's pin), model and tokenizer hashes, driver, memory mode, clocks, power mode. - Implemented / integrated / qualified matrix for the plan cache (rx_plan), projection (rx_projection), checker (checker2, receipt classes 1 and 2) and inference seams; missing boundaries named (translation validation is one). - Omeganese mapped to an exact frontend, IR, backend and supported semantic subset (the plan's term for the Omega surface language and OSC). - Reconciliation line: this workstream is NOT A MASTER PLAN; it feeds CURRENT_EXECUTION_PLAN.md Phase E (E1, E2) and Phase H3; no roadmap row changes. - Apparatus check scheduled as E09 (#252). Who does it. Opus 5.5 builds the inventory; Fable 5.1 reviews the contracts and pins. Exit gate. G0 met and every baseline status explicit (PASS, FAIL, NOT_RUN, BLOCKED_HARDWARE, BLOCKED_OPERATOR, MISSING_IMPLEMENTATION). Reporting rule. SI units beside the bound; no durations; no outside comparisons; no percent targets. No comments. Sign in to comment