Purpose — October 2026 frontier research and external collaboration (NON-RELEASE)
Maintain one evidence-backed research and collaboration radar for AIEN-dev, separate from the existing release coordinator Architecture #190. Identify current scientific results and open-source gaps that could produce new, falsifiable, working AIEN capabilities. This issue is an intake and prioritization tracker, not a new master implementation plan, license to change architecture, or claim of novelty.
Date/scope: first evidence sweep prioritizes papers originally published or materially revised 2026-10-01 through 2026-10-18, with September 2026 as a comparative fallback. Record initial publication, revision and repository-implementation dates separately; do not call an older paper a new October result.
Research-to-code admission gates
- R0 — Inventory actual code and gaps: inspect the current default branches and consumed lock revisions (not just README claims). Establish the CPU ARM64 (Raspberry Pi 5), x86-64 (2017 iMac i5-7500), and GB10 (DGX Spark) capabilities and evidence classes that matter to each candidate.
- R1 — Primary-source literature ledger: record a stable paper URL/DOI/arXiv/OpenReview reference, authors, verified dates, central claim, evidence quality, available artifacts/license and any independent reproduction. Include October 2026 negative/contradictory results.
- R2 — Open-source comparison & partner map: for each promising result identify actively maintained comparable OSS repositories, the specific code/features that overlap, missing features and tests, maintenance activity, licenses, and an exact upstream contribution/API proposal. Mark collaboration possible only when a concrete maintainer contact/channel and mutual benefit are established; do not claim a partnership exists.
- R3 — Novelty/differentiation check: explicitly search existing implementations and relevant commercial offerings; state known existing / plausible gap / unverified novelty. Reject ideas whose purported novelty is just a rename or benchmark mismatch.
- R4 — Reproducible prototype brief: for each shortlisted candidate identify owning AIEN component + exact paths/interfaces, hardware and power budget, baseline, correctness oracle, falsification/negative controls, model/data licenses, a finite time box and objective stop criteria.
- R5 — Review and issue handoff: rank candidates by measured payoff, feasibility, research differentiation, risks and critical-path interference. Only after duplicate search and review, create a narrow implementation issue in its owning code repository, cross-link here and #190 if it affects release. No speculative prototype is silently promoted to the release.
Three-machine experimental matrix
| Machine | Appropriate research role | Claim boundary |
|---|---|---|
| DGX Spark GB10 / ARM64 / 128 GB unified memory | Native Omega/FORGE kernels, attention, prefill/decode, memory movement, residency, energy measurements | Linux-hosted GPU benchmark is not native AIENOS GPU release qualification |
| Raspberry Pi 5 / ARM64 / 8 GB class | Small-model prefill, tokenization, native agent/runtime, signed evidence, recovery and edge decision cost | Existing Pi tests do not qualify the Spark |
| 2017 Intel iMac / i5-7500 / x86-64 | Independent numerical oracle, heterogeneous task execution, kernel portability, adversarial verifier checks | Native iMac worker is blocked on security/transport prerequisites |
Existing owners — link, do not duplicate
- Release authority / gates: Architecture #190; native Spark AIENOS #286 and GPU-runner triage Omega #523, Physics #66.
- Pi ↔ Spark finite integration: Architecture #231, qualification #232. This research issue is not a dependency for their first usable demo.
- Heterogeneous physical compute: AIENIX #6, with AIENOS iMac #419 and security prerequisites #409, #410, #411.
- Existing focused research: AIENIX Expert Ribbon #4, Omega #537 iMac LCD hypothesis, Omega #440 reservoir simulation, Omega #475 compositional generalization, Omega #543 Gated DeltaNet prefill, and the Omega #535 128K attention lane. These are existing workstreams, not tasks to recreate here.
Standard candidate record
Candidate ID / rank / date checked:
Paper(s): title, permanent URL, initial/revised/published dates
Scientific claim and limitations:
External OSS: repo, inspected commit, actual overlap, license, maintainer interface
What AIEN already implements (exact repo:commit:path):
Precisely missing capability / differentiation status:
Proposed owner, source paths and smallest PoC:
Baseline + numerical correctness oracle + negative control:
DGX Spark / Pi 5 / iMac scope and resource costs:
Evidence threshold, stop rule, security/release interaction:
Collaboration proposal (specific upstream issue/PR, not a hypothetical partner):
Decision: REPRODUCE / PILOT / CONTRIBUTE / PARK / REJECT
Execution and authority
Research remains parallel and bounded: protect the majority of engineering capacity and scarce GB10 hardware windows for #190's accepted release critical path. Do not update frozen candidate pins, mutate hardware/disks, start chip tests, publish outreach, merge PRs or claim external collaboration from this tracking issue. Hardware sessions and outreach require their respective approvals. Preserve failed and inconclusive evidence.
Done when: a reviewable, dated, source-linked October literature and comparable-repo shortlist exists, the highest-value experiments have falsifiable PoC briefs, outreach candidates have concrete upstream contribution scopes, and any accepted implementation is delegated to non-duplicative component issues with explicit evidence gates.