Interplane page as plain text, for reading tools and agents. English is the reference text: translate it with your own tool. Text in backticks and in ``` blocks (commands, fingerprints, file names) and link targets in <...> are exact: copy them, never translate them. Page: /drakestapleton/aien-architecture-mv/issues/9e443604a6f535f2 # aien-architecture-mv Canonical architecture for the AIEN ecosystem: flows, boundaries, ADRs, and the map from design to implementation repositories. Brought by drakestapleton Sign in to star 0 stars 0 watching About Files History Releases Proposed changes Issues For developers # Necessary-work programme: make the necessary work the limiting factor (epic) Open · #265 · open 2026-10-18 19:02 UTC Imported from GitHub aien-dev/aien-architecture-mv#265, by drakestapleton Labels: ready-for-human drakestapleton wrote on 2026-10-18 19:02 UTC Drake handed over the plan "AIEN: Make the Necessary Work the Limiting Factor" on 2026-10-18. This epic tracks it. Status: PROPOSED, nothing has run. Docs: plan, verbatim , feasibility research , workstream front page . NOT A MASTER PLAN (PLAN_AUTHORITY.md); feeds CURRENT_EXECUTION_PLAN.md Phase E and Phase H3. In plain words. Before making the chip faster, find the work that is not necessary and delete it, prove that what remains is necessary, run the remainder as close to the hardware's limit as it allows, and never call a slow result "physics" without a proof. Feasibility verdict (2026-10-18). Possible. All sixteen files the plan cites exist on today's main branches and every headline number matches its evidence file. Nothing needs new hardware, Python, CUDA or an outside service. Five collisions with standing rules are fixed in every issue below: SI units (s, J, W) beside a physical bound; Turing yield T and T/J as the Track C yardstick; no durations; no outside comparisons; role codes map to models. Six pieces of apparatus must be built: timer calibration (E09), hardware atlas (E10), translation-validation slice (E05), ledger fields, checked reduction library (E04), frozen objective suite (Phase 0). Order of work. Phase 0, then E01 E02 E04 on the CPU beside the PREFILL-E2E critical path (no chip slot needed), then E09 and E10 in the first quiet chip slot, then E05 to E08 and E11 to E13 by their gates, then E14 E16 E17 (E15 folds into PREFILL-E2E), then E18 to E20. Negative results stay on the ledger (the prefetch negative is already there). Issues - Phase 0: #264 - E01: #244 - E02: #245 - E03: #246 - E04: #247 - E05: #248 - E06: #249 - E07: #250 - E08: #251 - E09: #252 - E10: #253 - E11: #254 - E12: #255 - E13: #256 - E14: #257 - E15: #258 - E16: #259 - E17: #260 - E18: #261 - E19: #262 - E20: #263 Standing rules on every item. Spark judges tests; `quietlock check` before any GPU run; chip runs are never killed; no Python; no CUDA; results land through the PR desk; one orchestrator opens and merges PRs. No comments. Sign in to comment