name: "AIEN implementation initiative" about: "Plan, coordinate and qualify new AIEN features, experiments and significant changes" title: "[INIT] " assignees: ''
Executive summary
Goal: Current status: PROPOSED / NOT_RUN Next decision:
Current implementation evidence
Checked live repositories, code paths, tests, existing issues and PRs:
Scope and non-goals
Owning repository(s): Deliverables: Out of scope: Plan authority / roadmap reference (if relevant):
Dependencies, risks and decisions
Agent workstreams and file ownership
| Workstream | Owner / agent | Files or paths | Depends on | Parallel-safe? |
|---|---|---|---|---|
| 0 - Scope and interfaces |
Acceptance and qualification gates
- G0: Specification and owner/interface contract frozen
- G1: Implementation tests and observables verified
- G2: Negative controls / adversarial checks where relevant
- G3: Reproducible evidence and independent verification where required
- G4: Integration and merged-code verification
Write PASS / FAIL / INCONCLUSIVE / NOT_RUN / BLOCKED, with source commit and evidence links, for each gate.
Implementation ledger
Child issues: Pull requests / branches: Merged commits: Test and receipt links: Known failures / not run: Final verdict: NOT_RUN Follow-ups:
See the issue-first delivery protocol. An issue, green CI result or design document is not automatically proof of scientific or hardware qualification.