interplane.Get Omega
Read in your language

aien-sovereign-core-mv

AienOS host runtime: inference scheduling, paged KV state, the aien CLI and Spark verification tooling. Its inference engine is in alpha testing (DGX Spark GB10); Omega is the implementation destination.

Brought by drakestapleton

branch main Branches Tags History

aien-sovereign-core-mv / benchmarks / data / headstart / baseline-20261015-4c83e38 / timings / critical-path.json

315 lines · 8225 bytes Raw Blame History
1{
2 "estimate": {
3 "floor_s": 17.302,
4 "jobs": 20,
5 "label": "ESTIMATE, not a measurement",
6 "method": "Walk back from the last unit to finish along the edge that unblocked each unit (cargo unblocked_units / unblocked_rmeta_units). On rmeta-gated links the dependent waited for the predecessor frontend (sections.frontend.end). A metadata-pipelining compiler change can at most remove those waits on this chain; full-gated links (build scripts, proc macros, linked binaries) need finished artifacts and are not shortened. Upper bound = min(sum of predecessor frontend time on rmeta-gated chain links, build_end - floor) where floor = max(longest unit, sum of unit durations / jobs). This single-chain bound ignores that another chain may become critical; the realistic estimate that accounts for the whole graph and the job limit is the list-schedule replay (headstart-summarize.sh replay, timings/replay.json). Covers cold cargo build only.",
7 "realistic_estimate": "see timings/replay.json",
8 "rmeta_wait_on_chain_s": 4.94,
9 "scope": "cold cargo build --workspace only",
10 "upper_bound_saving_pct": 15.683,
11 "upper_bound_saving_s": 4.94
12 },
13 "observed": {
14 "build_end_s": 31.5,
15 "chain": [
16 {
17 "duration_s": 0.24,
18 "frontend_s": null,
19 "gate_time_s": null,
20 "gated_by": null,
21 "i": 308,
22 "mode": "todo",
23 "name": "libc",
24 "pred_frontend_s": null,
25 "start_s": 0.34,
26 "target": " build-script",
27 "version": "0.2.189"
28 },
29 {
30 "duration_s": 0.02,
31 "frontend_s": null,
32 "gate_time_s": 0.58,
33 "gated_by": {
34 "gate": "full",
35 "i": 308,
36 "name": "libc"
37 },
38 "i": 306,
39 "mode": "run-custom-build",
40 "name": "libc",
41 "pred_frontend_s": null,
42 "start_s": 0.58,
43 "target": " build-script (run)",
44 "version": "0.2.189"
45 },
46 {
47 "duration_s": 0.49,
48 "frontend_s": 0.4,
49 "gate_time_s": 0.6,
50 "gated_by": {
51 "gate": "full",
52 "i": 306,
53 "name": "libc"
54 },
55 "i": 304,
56 "mode": "todo",
57 "name": "libc",
58 "pred_frontend_s": null,
59 "start_s": 0.61,
60 "target": "",
61 "version": "0.2.189"
62 },
63 {
64 "duration_s": 0.22,
65 "frontend_s": 0.14,
66 "gate_time_s": 1.01,
67 "gated_by": {
68 "gate": "rmeta",
69 "i": 304,
70 "name": "libc"
71 },
72 "i": 297,
73 "mode": "todo",
74 "name": "jobserver",
75 "pred_frontend_s": 0.4,
76 "start_s": 1.06,
77 "target": "",
78 "version": "0.1.35"
79 },
80 {
81 "duration_s": 1.2,
82 "frontend_s": 0.54,
83 "gate_time_s": 1.2,
84 "gated_by": {
85 "gate": "rmeta",
86 "i": 297,
87 "name": "jobserver"
88 },
89 "i": 130,
90 "mode": "todo",
91 "name": "cc",
92 "pred_frontend_s": 0.14,
93 "start_s": 1.21,
94 "target": "",
95 "version": "1.4.7"
96 },
97 {
98 "duration_s": 0.92,
99 "frontend_s": null,
100 "gate_time_s": 2.41,
101 "gated_by": {
102 "gate": "full",
103 "i": 130,
104 "name": "cc"
105 },
106 "i": 100,
107 "mode": "todo",
108 "name": "aws-lc-sys",
109 "pred_frontend_s": null,
110 "start_s": 2.45,
111 "target": " build-script",
112 "version": "0.45.0"
113 },
114 {
115 "duration_s": 13.08,
116 "frontend_s": null,
117 "gate_time_s": 3.37,
118 "gated_by": {
119 "gate": "full",
120 "i": 100,
121 "name": "aws-lc-sys"
122 },
123 "i": 101,
124 "mode": "run-custom-build",
125 "name": "aws-lc-sys",
126 "pred_frontend_s": null,
127 "start_s": 3.37,
128 "target": " build-script (run)",
129 "version": "0.45.0"
130 },
131 {
132 "duration_s": 0.24,
133 "frontend_s": 0.18,
134 "gate_time_s": 16.45,
135 "gated_by": {
136 "gate": "full",
137 "i": 101,
138 "name": "aws-lc-sys"
139 },
140 "i": 99,
141 "mode": "todo",
142 "name": "aws-lc-sys",
143 "pred_frontend_s": null,
144 "start_s": 16.45,
145 "target": "",
146 "version": "0.45.0"
147 },
148 {
149 "duration_s": 0.55,
150 "frontend_s": 0.45,
151 "gate_time_s": 16.63,
152 "gated_by": {
153 "gate": "rmeta",
154 "i": 99,
155 "name": "aws-lc-sys"
156 },
157 "i": 96,
158 "mode": "todo",
159 "name": "aws-lc-rs",
160 "pred_frontend_s": 0.18,
161 "start_s": 16.63,
162 "target": "",
163 "version": "1.18.1"
164 },
165 {
166 "duration_s": 0.32,
167 "frontend_s": 0.21,
168 "gate_time_s": 17.08,
169 "gated_by": {
170 "gate": "rmeta",
171 "i": 96,
172 "name": "aws-lc-rs"
173 },
174 "i": 460,
175 "mode": "todo",
176 "name": "rustls-webpki",
177 "pred_frontend_s": 0.45,
178 "start_s": 17.08,
179 "target": "",
180 "version": "0.103.15"
181 },
182 {
183 "duration_s": 1.77,
184 "frontend_s": 1.23,
185 "gate_time_s": 17.29,
186 "gated_by": {
187 "gate": "rmeta",
188 "i": 460,
189 "name": "rustls-webpki"
190 },
191 "i": 453,
192 "mode": "todo",
193 "name": "rustls",
194 "pred_frontend_s": 0.21,
195 "start_s": 17.29,
196 "target": "",
197 "version": "0.23.45"
198 },
199 {
200 "duration_s": 0.12,
201 "frontend_s": 0.1,
202 "gate_time_s": 18.52,
203 "gated_by": {
204 "gate": "rmeta",
205 "i": 453,
206 "name": "rustls"
207 },
208 "i": 560,
209 "mode": "todo",
210 "name": "tokio-rustls",
211 "pred_frontend_s": 1.23,
212 "start_s": 18.52,
213 "target": "",
214 "version": "0.26.5"
215 },
216 {
217 "duration_s": 0.15,
218 "frontend_s": 0.08,
219 "gate_time_s": 18.62,
220 "gated_by": {
221 "gate": "rmeta",
222 "i": 560,
223 "name": "tokio-rustls"
224 },
225 "i": 271,
226 "mode": "todo",
227 "name": "hyper-rustls",
228 "pred_frontend_s": 0.1,
229 "start_s": 18.63,
230 "target": "",
231 "version": "0.27.9"
232 },
233 {
234 "duration_s": 1.49,
235 "frontend_s": 0.68,
236 "gate_time_s": 18.71,
237 "gated_by": {
238 "gate": "rmeta",
239 "i": 271,
240 "name": "hyper-rustls"
241 },
242 "i": 438,
243 "mode": "todo",
244 "name": "reqwest",
245 "pred_frontend_s": 0.08,
246 "start_s": 18.7,
247 "target": "",
248 "version": "0.12.28"
249 },
250 {
251 "duration_s": 2.75,
252 "frontend_s": 1.47,
253 "gate_time_s": 19.38,
254 "gated_by": {
255 "gate": "rmeta",
256 "i": 438,
257 "name": "reqwest"
258 },
259 "i": 149,
260 "mode": "todo",
261 "name": "cortex-rs",
262 "pred_frontend_s": 0.68,
263 "start_s": 19.4,
264 "target": "",
265 "version": "0.1.0"
266 },
267 {
268 "duration_s": 3.85,
269 "frontend_s": 2.85,
270 "gate_time_s": 20.87,
271 "gated_by": {
272 "gate": "rmeta",
273 "i": 149,
274 "name": "cortex-rs"
275 },
276 "i": 68,
277 "mode": "todo",
278 "name": "aien-runtime",
279 "pred_frontend_s": 1.47,
280 "start_s": 20.89,
281 "target": "",
282 "version": "0.1.0"
283 },
284 {
285 "duration_s": 6.76,
286 "frontend_s": null,
287 "gate_time_s": 24.74,
288 "gated_by": {
289 "gate": "full",
290 "i": 68,
291 "name": "aien-runtime"
292 },
293 "i": 14,
294 "mode": "todo",
295 "name": "aien-cli",
296 "pred_frontend_s": null,
297 "start_s": 24.74,
298 "target": " aien-cli \"bin\"",
299 "version": "0.1.0"
300 }
301 ],
302 "chain_full_gated_links": 6,
303 "chain_length": 17,
304 "chain_rmeta_gated_links": 10,
305 "longest_unit": {
306 "duration_s": 13.08,
307 "mode": "run-custom-build",
308 "name": "aws-lc-sys",
309 "target": " build-script (run)"
310 },
311 "sum_unit_duration_s": 346.04
312 },
313 "schema": "headstart-critical-path/v1",
314 "units": 625
315}