Phase ledger
Programme issue: aien-dev/aien#1 (transferred 2026-10-20 from aien-architecture-mv#278; the old URL redirects, comments and history preserved).
Phase numbers are sequence, not priority. Progress status words: PROPOSED, SCOPED, ACTIVE, IN_REVIEW, COMPLETE. Qualification verdicts are separate: PASS, FAIL, INCONCLUSIVE, NOT_RUN. A phase should close only with its acceptance evidence. The planned programme close guard is not present on main; issue reopening is not automatic.
| Phase | Issue here | Former issue | Title | Status | Qualification |
|---|---|---|---|---|---|
| P0 | #2 | arch#279 | Establish Aien's own repository, mission and B0 acceptance contract | ACTIVE (2026-10-20) | NOT_RUN |
| P1 | #3 | arch#280 | Build reproducible training episodes from the existing conversation archive | PROPOSED | NOT_RUN |
| P2 | #4 | arch#281 | Label human intent, corrections, successes and failures with evidence | PROPOSED | NOT_RUN |
| P3 | #5 | arch#282 | Freeze leakage-resistant evaluations and measure the baseline | PROPOSED | NOT_RUN |
| P4 | #6 | arch#283 | Train and compare a bounded first personal Aien candidate | PROPOSED | NOT_RUN |
| P5 | #7 | arch#284 | Qualify Aien B0 through one complete personal-assistance experience | PROPOSED | NOT_RUN |
| P6 | #8 | arch#285 | Keep one Aien continuous across iMac, Pi, Spark and MacBook | PROPOSED | NOT_RUN |
| P7 | #9 | arch#286 | Learn continually and anticipate useful help under bounded exploration | PROPOSED | NOT_RUN |
Order: P0 -> P1 -> P2 -> P3 -> P4 -> P5 produces B0 only if its gates pass; P6 extends continuity to the four devices; P7 adds evaluated continual learning. P3's evaluation schema may be drafted during P1/P2, but evaluation data is isolated before any fitting, retrieval indexing or preference extraction.
Mandatory external prerequisites (programme cannot close while any is open)
Listed as OPEN when this ledger was written (2026-10-20). A future close guard is planned to read these prerequisites from guard/policy.toml, but neither that file nor the guard exists on main. Check them manually before closing the programme; keep the ledger and policy in step if a guard is implemented.
| Area | Issues |
|---|---|
| Identity, persona, experience, release | aien-architecture-mv #159, #269, #190 |
| Physical Pi to Spark execution and independent acceptance | aien-architecture-mv #231, #232; aienos-mv #396, #398, #399; aien-protocols-mv #27; aien-sovereign-core-mv #586; omega-mv #505; aegis-runtime-mv #53 |
| Native Spark model path | aienos-mv #286, #327 (evaluated under aien-architecture-mv #190) |
| Learning economics and out-of-sample evidence | aien-architecture-mv #246, #262, #263, #276; omega-mv #583, #584, #600 |
P6 owns the remaining iMac and MacBook physical qualification if no existing issue owns it.