interplane.Get Omega
Read in your language

aien

aien-dev/aien

Brought by drakestapleton

Aien P0: Establish Aien's own repository, mission and B0 acceptance contract

Open · #2 · open 2026-10-20 12:03 UTC

Imported from GitHub aien-dev/aien#2, by drakestapleton

Labels: phase:P0

drakestapleton wrote on 2026-10-20 12:03 UTC

Parent: aien-dev/aien-architecture-mv#278. Intended home: aien-dev/allen; staged here until P0 creates the repo and transfers the programme.

Dependencies: none; begin with ownership and source inventory.

Outcome

Give Allen one project home, proposed as aien-dev/allen, containing his mission, phase ledger, data contracts, evaluation harness and release manifests. Drake explicitly requested a dedicated repo. Repository search found no existing Allen repo during filing; creation is pending because this connector exposes no create-repository operation.

Work

  • Create the repo using an authorized maintainer workflow, initially private pending a deliberate code-visibility decision; personal logs and trained personal artifacts remain separately access-controlled. Transfer this programme and its phase issues there, preserving redirects, comments and links; update architecture aien-dev/aien-architecture-mv#269/#278 and the AIENIX entry-point through their owners.
  • Map existing ALLEN identity/SubjectState, Cortex, agent-archive, runtime, protocol and device code. Record ownership/import boundaries; moving coordination to Allen must not mint a second identity or fork memory/authority.
  • Inventory available Claude/Codex/other full logs, raw mirrors, dates, missing spans, tool evidence and actual host locations. No assumption that every historical conversation was captured.
  • Freeze the first bounded task: project preparation with explicit constraints, correction, restart and verified output. Define measurable human-effort and outcome gates, access rules and supported devices.
  • Use Allen P0–P7 for phase sequence and B0 for the first qualified release; keep model generation IDs separate.

Acceptance

  • Repo exists; programme links resolve there; existing component owners are mapped.
  • Log inventory and access-controlled source manifest exist, with gaps explicit.
  • B0 acceptance contract, budgets, role/permission boundary and definition of success reviewed before training.
  • Raw logs, weights and secrets cannot accidentally enter source control; deletion/export ownership recorded.

Delivery and evidence

Phase numbers denote sequence, not issue priority. Status: PROPOSED; qualification: NOT_RUN. Read the current owning repo's AGENTS.md, accepted ADRs, PLAN_AUTHORITY/CURRENT_EXECUTION_PLAN and active PRs before edits. Reuse existing owners and run org-check where required; document extend/reuse/missing with pinned code. Rust scaffolding/Omega destination follows current ADR 0024; do not silently substitute an external training service or create a parallel identity, memory store or authority. Use existing review, Spark scheduling and qualification procedures. Record tested commits, data/model/config digests, reproducible commands, PASS/FAIL/INCONCLUSIVE/NOT_RUN and missing coverage. Do not put raw conversations, credentials or private training samples in public issues/PRs; publish synthetic fixtures and access-controlled evidence references. Filing authorizes the described development work, not deployment or a large compute run outside existing controls.

Blocking relationships

Blocked by / must reconcile with: architecture aien-dev/aien-architecture-mv#159 (persistent persona and scoped memory), aien-dev/aien-architecture-mv#269 (Allen program ownership/mechanics) and aien-dev/aien-architecture-mv#190 (whole-system release authority). P1 and all later phases depend on this phase. P0 cannot close until the dedicated aien-dev/allen repository exists, contains the Allen mission and acceptance contract, and the phase programme has been transferred or linked with preserved history.

Programme close guard (required)

When aien-dev/allen is established, implement and test a repository-owned completion guard for the programme tracker: on attempted closure of the parent, inspect P0–P7 and the parent’s mandatory prerequisite list; if any required phase/prerequisite remains open or its evidence checklist is incomplete, reopen the parent and explain which blockers remain. Keep a human-readable manual checklist for items that cannot be machine-verified. Test the guard using open, closed-with-missing-evidence, and fully accepted fixtures. P0 is not complete until the guard is installed and tested or a reviewed repo-level equivalent is documented.

GitHub permissions can allow administrators to bypass or remove automation. The gate can reliably catch and undo premature closure under its installed policy; no issue template or ordinary workflow can promise that a privileged repository owner is physically unable to override it. Record any override and its rationale in the audit trail; it never counts as passing the project gate by itself.

drakestapleton wrote on 2026-10-20 12:36 UTC

P0 progress, 2026-10-20 (coordinator):

  • Repository created: https://github.com/aien-dev/allen, private at creation as this issue asked. Visibility decision and its gate recorded in docs/PLAN.md: public when the source-control guard is green on main.
  • Programme and P0..P7 transferred with redirects: arch#278 -> #1, arch#279..#286 -> #2..#9. Labels programme, phase:P0..P7.
  • Architecture #269, #159 and #190 notified by comment; aienix entry point: issue filed in aien-dev/aienix.
  • Skeleton on main: README, AGENTS.md, docs/MISSION.md, docs/PHASES.md (phase ledger + external prerequisite table), docs/PLAN.md (stream table), .gitignore first cut.

Streams dispatched (branches already exist on origin): map/v0 source map with pinned commits; inventory/v0 log inventory and access-controlled manifest pointer; contract/v0 B0 acceptance contract; guards/v0 programme close guard + source-control guard (Rust crate allen-guard, CI, fixture tests). The desk merges and closes this issue against its acceptance list; the close guard is tested before close.

Sign in to comment