interplane.Get Omega
Read in your language

aien

aien-dev/aien

Brought by drakestapleton

Aien P5: Qualify Aien B0 through one complete personal-assistance experience

Open · #7 · open 2026-10-20 12:03 UTC

Imported from GitHub aien-dev/aien#7, by drakestapleton

Labels: phase:P5

drakestapleton wrote on 2026-10-20 12:03 UTC

Parent: aien-dev/allen#1. Intended home: aien-dev/allen; staged here until P0 creates the repo and transfers the programme.

Dependencies: https://github.com/aien-dev/allen/issues/6 (P4).

Outcome

Deliver B0: one useful personal Allen who understands a bounded project goal, acts with evidence, accepts correction and remembers across restart. Coordinate with architecture aien-dev/aien-architecture-mv#269's runtime owners, Sovereign Core and existing ALLEN state.

Work

  • Integrate the qualified P4 candidate, or explicitly report that training did not pass and retain the best P3 baseline. B0's manifest must state whether learning lives in model weights, retrieved memory or both.
  • Link continuing purpose, versioned interpretation, plan, authority and outcome through existing objective/SubjectState/Cortex records. Do not equate a completed file write with satisfaction of human intent.
  • Use existing interfaces to show current interpretation, progress, assumptions and evidence. Corrections invalidate affected shortcuts; unaffected work stays valid only when its dependencies remain valid.
  • Run the frozen task with a fresh user-selected variation: admit goal, execute bounded work, detach/reattach view, correct the interpretation, restart and repeat a related task.
  • Test corrupt/stale memory, model replacement, rollback, forgotten preferences and interrupted effects. Inherited runtime #665/#667 and effect-ledger behavior remains authoritative.
  • Package B0 with source/model/data/memory/policy digests, supported capabilities and release evidence.

Acceptance

  • One same-candidate demonstration passes the P0/P3 gates, including independent artifact checks.
  • Identity and committed history survive restart/model replacement; no repeated committed external effect.
  • Human effort and accepted outcomes are measured against baseline, including corrections and failures.
  • Release is labelled QUALIFIED only within demonstrated scope; otherwise FAIL/INCONCLUSIVE/NOT_RUN with the remaining prerequisite.

Delivery and evidence

Phase numbers denote sequence, not issue priority. Status: PROPOSED; qualification: NOT_RUN. Read the current owning repo's AGENTS.md, accepted ADRs, PLAN_AUTHORITY/CURRENT_EXECUTION_PLAN and active PRs before edits. Reuse existing owners and run org-check where required; document extend/reuse/missing with pinned code. Rust scaffolding/Omega destination follows current ADR 0024; do not silently substitute an external training service or create a parallel identity, memory store or authority. Use existing review, Spark scheduling and qualification procedures. Record tested commits, data/model/config digests, reproducible commands, PASS/FAIL/INCONCLUSIVE/NOT_RUN and missing coverage. Do not put raw conversations, credentials or private training samples in public issues/PRs; publish synthetic fixtures and access-controlled evidence references. Filing authorizes the described development work, not deployment or a large compute run outside existing controls.

Blocking relationships

Depends on P4 (#283). Integrate with architecture aien-dev/aien-architecture-mv#159 and aien-dev/aien-architecture-mv#269; report into release authority aien-dev/aien-architecture-mv#190. Reconcile with architecture aien-dev/aien-architecture-mv#231 (physical Pi-to-Spark experience) and aien-dev/aien-architecture-mv#232 (independent physical acceptance). B0 is a bounded release milestone, not Allen programme completion; P6/P7 and all parent-level mandatory prerequisites remain open.

No comments.

Sign in to comment