Issue-first delivery protocol

Status: OPERATING PROCESS (effective on merge). Scope: substantive new AIEN capabilities, experiments, significant fixes, cross-repository changes and agent implementation work. NOT A MASTER PLAN.

Tracking issue: aien-architecture #175. Reference implementation issue: omega #358 (AT-0).

Authority and evidence

This document governs how work is recorded and qualified, not what AIEN should build or the order in which it should build it. It does not supersede PLAN_AUTHORITY.md, CURRENT_EXECUTION_PLAN.md, doctrine/ARCHITECTURE.md, accepted ADRs or doctrine/ROADMAP.md.

Before opening an issue, check the live owning repository's source, tests, build contracts and existing issues. Plans and issues establish intent, not current implementation. Never mark a roadmap milestone complete solely because an issue or PR closed. Only the canonical milestone registry owns that status.

Human-Directed Agentic Engineering

This process records the two loops of Human-Directed Agentic Engineering (HDAE). Humans set the objective, architecture, constraints, acceptance gates and stopping points, then review the observed behavior. Within those boundaries, agents implement, execute checks, diagnose failures and revise. Human acceptance remains separate from agent execution and model review; naming the method does not change plan authority or qualification policy.

Method reference: Gregory M. Kurtzer, Ginux: Building an Independent Kernel That Runs Linux Userspace through Human-Directed Agentic Engineering (2026), doi:10.5281/zenodo.23682548. The report documents a method and case study and does not claim to originate the general idea or phrase.

Normal workflow

  1. Discover and deduplicate. Identify the owning repository and current executable behavior. Search existing open/closed issues and merged PRs. If a capability already exists, link the evidence instead of recreating it.
  2. Open one tracking issue before work. Use the initiative issue template for new capabilities, research, major fixes or cross-repo work. Give an executive summary that a non-specialist can understand, precise observed code evidence, goal, excluded scope, owner, dependencies and risks. Set status PROPOSED. Smaller defects can use the repository's existing bug form.
  3. Define acceptance before coding. Name measurable, falsifiable gates (tests, baseline/negative controls, security/performance checks when relevant), artifacts and independent verification needs. Distinguish PASS, FAIL, INCONCLUSIVE, NOT_RUN and applicable blocked statuses. Declare agent and path ownership. Freeze interfaces before parallel implementations.
  4. Plan bounded workstreams. Small task: one owner, one branch and one PR. Medium task: one parent issue with a few independently reviewable PRs. Large cross-repo task: parent issue in aien-architecture plus child issues in owning repositories, linked in both directions. The parent coordinates, not replaces, the execution plan or owning-repo backlog. Spawn as many agents as useful, not a fixed number. Do not assign two concurrent agents the same paths.
  5. Implement via branches and PRs. Work in isolated worktrees/branches; respect each repository's AGENTS.md, access, security and CI. Every implementation PR references a tracking issue and identifies the gate(s) it advances. Use Refs owner/repo#N on intermediate PRs; use Closes #N only when the PR really completes that issue. Keep one PR independently testable.
  6. Verify with primary evidence. Show exact commands, outputs/results, negative tests, commit IDs, relevant machine profile and immutable receipts where required. An assertion in an issue, README, report or agent summary is not evidence of implementation. Independent qualification must be independent in fact; otherwise record UNISOLATED or INCONCLUSIVE.
  7. Reconcile and close. The issue is the change ledger: maintain links to child issues, PRs, merged SHAs, evidence and known failures. Close only when the issue's acceptance contract is satisfied or close explicitly as cancelled/superseded with that reason. Link downstream defects/new work rather than burying partial results. Before changing a canonical roadmap status, follow PLAN_AUTHORITY.md and cite qualified evidence.

Minimal initiative issue contract

Every substantive initiative must have:

For experimental research, append the hypothesis, alternative explanations, positive and negative controls, independence/blinding conditions, precommitted scoring and precisely bounded claims. For a routine bug, keep these sections proportionate.

Status is not a scientific verdict

Progress states: PROPOSED -> SCOPED -> ACTIVE -> IN_REVIEW -> COMPLETE; BLOCKED or CANCELLED where appropriate.

Qualification verdicts are separate: PASS, FAIL, INCONCLUSIVE, NOT_RUN or documented blocked status. A green CI check is not evidence of a scientific discovery, silicon qualification, security guarantee or benchmark superiority. An issue can be COMPLETE with a recorded FAIL when its objective was to run an experiment and report the outcome honestly.

Exceptions, older work and enforcement

Operator checklist