docs: PIPELINE.md matches phase 3 as finished (hosted test workflows removed)
merged36823ea3a0aacb71 #113 · opened 2026-10-18 23:47 UTC · closed 2026-10-18 23:56 UTC · merged 2026-10-18 23:56 UTC
Imported from GitHub aien-dev/interplane-mv#113, by drakestapleton
Labels: ready-to-merge
Base e685149ccddfd16952cc5d91820b44aeb91f9625 · Head f224804ad7705e3dde7c876465e592445ce9ac03
Merged on GitHub as 12b59dc96294b9d1a305c06d8cae461fa602fae4; reachable from main ec91e9c2cc64c4885e93fbcbf8c0b657e16cb17a (observed 2026-11-18T16:39:55Z)
drakestapleton wrote on 2026-10-18 23:47 UTC
Documentation only. docs/PIPELINE.md now matches what landed today:
The opening paragraph says the hosted test workflows were removed on 2026-10-18 and AIEN Verification is the only test-related workflow. In aegis-runtime, aien-protocols and spark-rsi this replaces a garbled sentence.
The label command uses aien-dev/<repo> instead of the old aien-spark org.
The required-checks paragraph no longer says the old hosted jobs "run only on workflow_dispatch" (they no longer exist).
Crumbs recompiled with the repository's pinned tool.
Labelled ready-to-merge: the Spark pipeline merges it once the Spark verdict is PASS.
Apply it
git checkout -b patch-36823ea3a0aacb71e685149ccddfd16952cc5d91820b44aeb91f9625
curl -fsSL https://interplane.io/drakestapleton/interplane-mv/patches/36823ea3a0aacb71.patch | git am
diff --git a/docs/PIPELINE.md b/docs/PIPELINE.md
index a487702..11ba889 100644
--- a/docs/PIPELINE.md
+++ b/docs/PIPELINE.md
@@ -1,11 +1,11 @@
# The Spark pipeline: how a pull request gets tested and merged
Since 2026-10-16 the DGX Spark is the only test judge for this repository (ADR 0033 Decision 11,
-phase 3, agreed by Drake on 2026-10-15). Enrollment comes first (step 1:
-the gates and trust anchors); the hosted `ci` workflow keeps running on pull requests and pushes
-until step 2 retires it to a manual trigger. Each of its jobs is a Spark gate in `tests/gates/` (one `.gate` per job,
-same commands, dispatched by `tests/gates/run.sh`). The `qualification` workflow was already manual
-(it needs a live model endpoint) and is not a gate.
+phase 3, agreed by Drake on 2026-10-15). On 2026-10-18 the hosted test workflows were removed; the
+only test-related workflow left is AIEN Verification (`.github/workflows/aien-verification.yml`),
+which builds nothing from this repository and only checks the bundle the Spark signs. The manual
+`qualification` workflow stays: it probes a live model endpoint on a self-hosted runner and tests no
+code on GitHub. Each former hosted job is a Spark gate in `tests/gates/`.
## What happens to every pull request
@@ -35,7 +35,7 @@ Without the label nothing is merged. Remove the label to stop a merge.
To add the label from a terminal use the REST call (`gh pr edit --add-label` can fail on
repositories with a Projects (classic) error):
-`gh api -X POST repos/aien-spark/interplane/issues/<number>/labels -f 'labels[]=ready-to-merge'`.
+`gh api -X POST repos/aien-dev/interplane-mv/issues/<number>/labels -f 'labels[]=ready-to-merge'`.
## Changes to the pipeline itself