Interplane page as plain text, for reading tools and agents. English is the reference text: translate it with your own tool. Text in backticks and in ``` blocks (commands, fingerprints, file names) and link targets in <...> are exact: copy them, never translate them. Page: /drakestapleton/omega-mv/blob/main/evidence/EXP-002D/04_verdict.txt # omega-mv Omega: a language for verified programs, semantic identity and machine realization. Seed-born work and existing implementations have distinct provenance. Brought by drakestapleton Sign in to star 1 stars 0 watching About Files History Releases Proposed changes Issues For developers branch `main` Branches Tags History `omega-mv / evidence / EXP-002D / 04_verdict.txt` 11 lines ยท 1050 bytes Raw Blame History 1 EXP-002D Stage A, receipt 4 of 4: VERDICT 2 written: 2026-10-03T23:34:15Z 3 rule: R28-v2 as frozen in receipt 1 (docs/turing/PRD2_PREDICTION_FORMAT.md, sha256 `2199e24680e9ec62b6808ec56990a6fa6588049a161a90f8a2bc4534f0802db9`) 4 row 28 (mixture weight rule), omega side, under PRD2: MATCH 5 negative controls N1-N4: all hold (v2 does not make everything pass) 6 EXP-002D overall: INCOMPLETE (unchanged). Reason changed from "rule not evaluable under the Wave 1 prediction format" 7 to "sealed harness re-run owed": the evaluator-side test (hostile_leak.c #28 in the private repository) still reads PRD1 8 and prints PENDING; it must be re-pointed at PRD2 and the EXP-002D development runner re-run under a new omega pin, with 9 its own receipt, before row 28 counts. Also still open from the last runner record: HC-meas-lag1-control block 0 edge 10 mismatch (0.00313 vs null upper 0.00308) and the stop-27 TPS1-adapter gate PENDING; both outside this receipt. 11 No sealed outcome of EXP-002A/B/C/AR was touched. No PRD1 byte or receipt was rewritten. No threshold changed.