Omega mixed algebra: phase-domain Z3 digital twin (MA-8 step 0)
Status: ADR 0019 MA-8 step 0, a simulated precursor of MA-8 ("physical
phase or external-Machine realization"). It is not MA-8 itself: there is no
physical device. Provenance of every result is SIMULATED_DEVELOPMENT
(ADR 0018 AR1/AR2 wording). It makes no speed, latency, energy or physical
claim, does no selection or ranking, and mints no semantic id or digest. It
may be cited as model-only evidence toward the Turing gate
DIGITAL_PHASE_EQUIVALENCE; it does not claim that gate.
Code: src/algebra/phase_twin.{h,c} (twin), tests/algebra/test_phase_twin.c
(gates and receipt). Receipt: evidence/MIXED_ALGEBRA/phase_twin_receipt.<sha256>.json.
Commands: make test-phase-twin (full run into build/, quick run plain and
under ASan+UBSan with byte-identical receipts, reproduction check against the
committed receipt; about 90 s wall on the Spark), make phase-twin-receipt
(clean committed tree only; writes the content-addressed receipt). C11 + libm,
no other dependencies, CPU only.
Sources: ADR 0019 (sections 3, 5, 6.3, 8), ADR 0018 (sections 3, 12),
docs/plans/mixed-algebra/MIXED_ALGEBRA_THEORY.md section 6,
docs/plans/mixed-algebra/research/PHASE_EXPERIMENT_AND_HARDWARE.md
("research note"), all at aien-architecture origin/main 1438799. Oracle:
oma_z3_add / oma_z3_mul (src/algebra/oma_z3.c).
Claim form
Every result below has the form: under model profile P (the declared
parameters), candidate realization C versus the oracle oma_z3, measured X,
from the receipt. Nothing transfers to hardware without AR4-grade physical
evidence.
Model
Encoding: Z3 value k is the tone A cos(2 pi n / 64 + 2 pi k / 3), so
f_c = f_s / 64 and the phase is 0, 120 or 240 degrees. Converter full scale
is +/-1; A = 0.5 (-6.02 dBFS). Converters are mid-tread quantizers with
clipping (bits = 0 means ideal).
Addition is phasor multiplication (theory 6.1, 6.2). Three candidate realizations:
| rz_id | mechanism | where the multiply happens |
|---|---|---|
| PT_corr_product | two channels emit a and b; each is I/Q-correlated at f_c; the two correlator outputs are multiplied | complex multiply of measured phasors (research note loopback) |
| PT_mixer | two tones enter an ideal analog mixer; the product is digitized and correlated at 2 f_c | analog multiply (simulated) |
| PT_nco | 32-bit phase words a T + b T (T = floor(2^32/3)) wrap-add; one tone at that phase | integer phase accumulator (NCO) |
Measurement: I = sum x[n] cos(2 pi n / 64), Q = -sum x[n] sin(2 pi n / 64)
(bin 2 for mixer and doubler). Decision: k = mod(round(theta / 120 deg), 3),
cells +/-60 degrees.
Calibration (research note "Timing and calibration"): every
interval operations, emit k = 0 on each path reps times, average the
correlator outputs, store the phase as the path offset and the magnitude as
the erasure reference; then emit k = 1 reps times and require
120 +/- tol degrees after correction, else a calibration fault. Later
correlator outputs are rotated by the stored offset. The reference is
time-multiplexed on the signal paths (the research note's procedure); a
dedicated always-on pilot tone is the hardware alternative and is not modelled.
Flags (each fails the trial; no voting): erasure (magnitude below 0.3 x reference), reject (output phase more than 30 degrees from the nearest center), calibration fault (every operation in a block after a failed check).
Noise and impairments: AWGN per sample at the ADC input (std sigma,
independent per channel); one Gaussian phase jitter per channel per frame;
DAC and ADC quantization; fixed per-channel path offset; linear per-channel
drift in simulated time (frame_s per frame, calibration frames included).
Symbol SNR at the correlator output is rho = A^2 N / (4 sigma^2), equal to
the research note's rho = N SNR_1 / 2.
Declared simplifications: the analog path is a pure phase shift at f_c applied before the DAC; noise is white Gaussian; converters have no INL/DNL or spurs; mixer and doubler are ideal multipliers; one shared clock (no sample slip, no frequency offset); no crosstalk; no amplitude drift.
RNG: xoshiro256** seeded by splitmix64, Gaussian by the Marsaglia polar method, fixed seed per scenario (listed in the receipt). No clock or host data enters the receipt except the recorded commit, dirty count and compiler version, so plain and sanitizer builds write byte-identical receipts.
Profiles
| profile | f_s | N | bits DAC/ADC | use |
|---|---|---|---|---|
| A | 125 MS/s | 4096 | 14/14 | research note reference design |
| B | 1 MS/s | 1024 | 12/12 | research note low-rate design |
| B-ideal | 1 MS/s | 1024 | ideal | quantization-free control |
| SWEEP | 1 MS/s | 64 | ideal | gate 2; flags, jitter, offset, calibration off |
| P (contract) | 1 MS/s | 64 | 12/12 | gate 3; frame 128 us, rho 25 dB per input, jitter 1 deg rms, flags on, calibration every 1000 ops with 32 reference frames, tol 5 deg |
Pre-registered gates and thresholds
These thresholds are fixed in this document and in tests/algebra/test_phase_twin.c
before the committed receipt is generated.
- Self-checks. Decoder boundaries (59.9 degrees -> 0, 60.1 -> 1), NCO wrap pair (2,2) -> 1, argument rejection, RNG moments, the analytic add reference stable between grids of 3600 and 7200 points (relative 1e-3), Craig integral at 0 dB within 5e-4 of 0.1834.
- Gate 1, noiseless (exhaustive). Profiles A, B, B-ideal x realizations
PT_corr_product, PT_mixer, PT_nco: all 9 input pairs x 1000 repetitions
decode equal to
oma_z3_add, zero mismatches, zero flags. Multiply by a known constant on profile B (calibration on): 9 pairs x 1000 equal tooma_z3_mul. Quantization sweep 16 to 1 bits is informational only. - Gate 1b, research note pass condition. Profile A,
SNR_1= 80 dB per sample, 1 ps jitter (7.0e-4 degrees at 1.953 MHz), 3.35 degree fixed offset on channel b (1 m cable), calibration on: 9 x 1000, zero failures. - Gate 2, error rate versus SNR (PT_corr_product, profile SWEEP). At rho
= 0, 6, 8, 10, 12 dB per input with 1e5, 2e5, 4e5, 1e6, 4e6 trials:
(a) the exact add reference (numerical circular convolution of the exact
PSK phase density, 7200 points) lies inside the measured Wilson 99.9 %
interval; (b) the research note's Monte Carlo add values (3.52e-1, 5.76e-2,
1.52e-2, 1.96e-3, 8.46e-5) are within 5 % of the exact reference at 10 and
12 dB; (c) the single-phasor read of channel a matches Craig's exact 3-PSK
error inside Wilson 99.9 % wherever at least 100 errors are expected, and
Craig matches the research note's table within 1 %; (d) pure 15 degree
per-input jitter, 4e5 trials:
2 Q(60 / (sqrt2 x 15))= 4.68e-3 inside Wilson 99.9 %. - Gate 3, calibration (profile P). Cases offset-only (50, 20 degrees), drift-only (2.0, 1.5 degrees/s), offset and drift. Uncalibrated runs (2e5, 1e6, 2e5 trials) must violate the contract: Wilson 95 % lower bound above 1e-6. Calibrated runs (2e5, 1e6, 4e6 trials) must have zero failures. The contract case (offset and drift, 4e6 trials) must meet the contract below.
- Gate 4, receipt. Records every profile parameter, the contract, measured
error rates with Wilson bounds, evidence tiers per ADR 0019 section 8, the
Z3 multiply verdict, and field names from
src/turing/field.hwhere they apply (rz_id,algebra,representation,tier_source,run_id,git_commit,tree_dirty,toolchain,verified).
Contract (ADR 0018 BOUNDED_STOCHASTIC): operation Z3 add (a + b) mod 3,
realization PT_corr_product at profile P; bound: probability of a failed
operation (mismatch or any flag) <= 1e-6; confidence 95 %; required: zero
failures in at least ceil(-ln 0.05 / 1e-6) = 2,995,733 trials, and the
two-sided Wilson 95 % upper bound <= 1e-6 (hence 4,000,000 trials).
Pre-registration record
The thresholds above were written into the test code before the first full run, but that run (uncommitted working tree) came before this document. One parameter changed after it: profile P first used 8 calibration reference frames. At rho 25 dB the k = 1 check then misfires about once per 4,000 calibrations (6e-5 per check); one such false calibration fault flagged a block of 1,000 operations in the drift-only and contract cases. The frame count was raised to 32, which puts the check tolerance at about 8 standard deviations. The contract bound, confidence, SNR, trial counts, tolerances and flag thresholds did not change. This is a post-observation change to a calibration parameter and is recorded here as such.
Z3 multiplication
Two unknown operands: not realizable in this model. Phasor multiplication
realizes Z3 addition. Z3 a b corresponds to w^(a b) = (w^a)^b, which is
exponentiation, and no bilinear phasor operation computes it (theory 6.4). A
decode-then-select circuit (decode b digitally, then identity, doubler or
constant source) is a hybrid digital realization and is not claimed.
Multiplication by a known constant b: realized (gate 1): b = 0 is a constant
k = 0 source, b = 1 identity, b = 2 a frequency doubler (squarer read at
2 f_c), since w^(2a) = conj(w^a).
Evidence tiers (ADR 0019 section 8)
| item | tier | scope |
|---|---|---|
| add, noiseless, each profile x realization | E3 (all 9 pairs) | the twin model; the ideal map itself is E4 (theory 6.1 proof) |
| mul by known constant, noiseless | E3 | the twin model |
| add, bounded contract at profile P | E1 | the twin model only |
| SNR curve and jitter check | model validation, not a contract | agreement with analytic references |
| mul of two unknowns | E0: no realization exists |
What the twin proves and what it does not
It shows that, inside the declared model, the phase encoding plus the three
add mechanisms compute exactly oma_z3_add on the whole Z3 domain; that
the decoder's error statistics match the analytic 3-PSK results, so the
contract arithmetic is right; and that the reference-frame calibration turns
a failing channel (offset and drift) into one that meets a 1e-6 bound at
rho 25 dB.
It does not show that any physical board does this. ADR 0018 forbids a
physical analog claim without physical evidence, and there is none. It makes
no claim about speed, latency, energy, or cost against the digital
oma_z3_add. The noise models are idealized (list above); real converters,
cables, mixers and clocks have effects the twin leaves out.
What a real board must meet for the contract to transfer
A board inherits the twin's contract only if measurements (AR4 evidence) show all of these at the operating point used:
- One clock and PLL for DAC, ADC and NCOs; NCOs cleared on the same cycle;
no sample slip (one sample at
f_s / 64is 5.625 degrees). - Symbol SNR at the correlator output >= 25 dB per input:
N SNR_1 / 2 >= 316, measured with the board's effective bits, at -6 dBFS and no clipping. - DAC and ADC >= 12 effective bits over the used band, no spur at f_c or 2 f_c above the noise that the SNR figure assumes.
- Frame-to-frame phase jitter <= 1 degree rms per channel (1.42 ns rms at 1.953 MHz; 178 ns at 15.625 kHz).
- Any fixed path offset, with the k = 1 check passing (120 +/- 5 degrees).
- Phase drift <= 2 degrees/s per channel with recalibration every 1,000 operations (0.13 s at profile P), or proportionally faster recalibration; board temperature within 2 degrees C across a block.
- 32 reference frames per calibration step at rho 25 dB (fewer at higher SNR, as long as the check's false-fault rate stays below the contract).
- Noise white and Gaussian enough that the measured error curve matches the gate 2 curve; independent channels; crosstalk below the noise floor.
- For PT_mixer: mixer linear enough that the 2 f_c product term dominates, and the ADC sees the product without clipping.
Results (receipt evidence/MIXED_ALGEBRA/phase_twin_receipt.5d6ca45e970faf19986490264e35db453211ffe6dfff03d1cfb10937f329a22b.json)
Generated by make phase-twin-receipt from clean commit 48ef003 (tree_dirty 0),
gcc 13.3.0. Overall PASS. The quick run (trial counts / 50) is byte-identical
between the plain and the ASan+UBSan build.
- Gate 1: 9 configurations (A, B, B-ideal x corr_product, mixer, nco), 9,000 checks each, 0 mismatches, 0 flags. Largest phase error from a cell center: 3.6e-2 degrees (mixer, 12-bit). Multiply by known constant: 9,000 checks, 0 failures. Quantization is harmless down to 2 bits (max 3.75 degrees); the degenerate 1-bit mid-tread quantizer fails (informational).
- Gate 1b: 9,000 checks at the research note's reference operating point, 0 failures.
- Gate 2, PT_corr_product add error versus rho per input (exact reference /
research note / twin):
rho exact note twin (errors / trials) Wilson 99.9 % 0 dB 3.517e-1 3.52e-1 3.531e-1 (35,314 / 1e5) 3.48e-1 .. 3.58e-1 6 dB 5.771e-2 5.76e-2 5.793e-2 (11,585 / 2e5) 5.62e-2 .. 5.97e-2 8 dB 1.514e-2 1.52e-2 1.526e-2 (6,104 / 4e5) 1.46e-2 .. 1.59e-2 10 dB 1.961e-3 1.96e-3 1.938e-3 (1,938 / 1e6) 1.80e-3 .. 2.09e-3 12 dB 8.530e-5 8.46e-5 9.125e-5 (365 / 4e6) 7.68e-5 .. 1.08e-4 Single-phasor reads match Craig's formula (for example 1.020e-4 vs 1.065e-4 at 10 dB). Jitter 15 degrees per input: 4.68e-3 measured, 4.68e-3 formula.
- Gate 3 (profile P, contract bound 1e-6 at 95 %): uncalibrated offset-only, drift-only and offset-and-drift runs fail at 1.00, 0.80 and 1.00 (contract violated). Calibrated: 0 failures in 2e5, 1e6 and 4e6 operations; the contract case gives Wilson 95 % upper bound 9.6e-7 and E1 bound 7.5e-7: CONTRACT_MET under profile P. 4,000 calibrations, 0 calibration faults.