Interplane page as plain text, for reading tools and agents. English is the reference text: translate it with your own tool. Text in backticks and in ``` blocks (commands, fingerprints, file names) and link targets in <...> are exact: copy them, never translate them. Page: /drakestapleton/omega-mv/blob/main/spec/mixed-algebra-phase-twin.md # omega-mv Omega: a language for verified programs, semantic identity and machine realization. Seed-born work and existing implementations have distinct provenance. Brought by drakestapleton Sign in to star 1 stars 0 watching About Files History Releases Proposed changes Issues For developers branch `main` Branches Tags History `omega-mv / spec / mixed-algebra-phase-twin.md` 243 lines ยท 13881 bytes Raw Blame History Rendered 1 # Omega mixed algebra: phase-domain Z3 digital twin (MA-8 step 0) 2 3 Status: ADR 0019 **MA-8 step 0**, a simulated precursor of MA-8 ("physical 4 phase or external-Machine realization"). It is not MA-8 itself: there is no 5 physical device. Provenance of every result is `SIMULATED_DEVELOPMENT` 6 (ADR 0018 AR1/AR2 wording). It makes no speed, latency, energy or physical 7 claim, does no selection or ranking, and mints no semantic id or digest. It 8 may be cited as model-only evidence toward the Turing gate 9 DIGITAL_PHASE_EQUIVALENCE; it does not claim that gate. 10 11 Code: `src/algebra/phase_twin.{h,c}` (twin), `tests/algebra/test_phase_twin.c` 12 (gates and receipt). Receipt: `evidence/MIXED_ALGEBRA/phase_twin_receipt..json`. 13 Commands: `make test-phase-twin` (full run into `build/`, quick run plain and 14 under ASan+UBSan with byte-identical receipts, reproduction check against the 15 committed receipt; about 90 s wall on the Spark), `make phase-twin-receipt` 16 (clean committed tree only; writes the content-addressed receipt). C11 + libm, 17 no other dependencies, CPU only. 18 19 Sources: ADR 0019 (sections 3, 5, 6.3, 8), ADR 0018 (sections 3, 12), 20 `docs/plans/mixed-algebra/MIXED_ALGEBRA_THEORY.md` section 6, 21 `docs/plans/mixed-algebra/research/PHASE_EXPERIMENT_AND_HARDWARE.md` 22 ("research note"), all at aien-architecture `origin/main` `1438799`. Oracle: 23 `oma_z3_add` / `oma_z3_mul` (`src/algebra/oma_z3.c`). 24 25 ## Claim form 26 27 Every result below has the form: under model profile P (the declared 28 parameters), candidate realization C versus the oracle `oma_z3`, measured X, 29 from the receipt. Nothing transfers to hardware without AR4-grade physical 30 evidence. 31 32 ## Model 33 34 Encoding: Z3 value k is the tone `A cos(2 pi n / 64 + 2 pi k / 3)`, so 35 `f_c = f_s / 64` and the phase is 0, 120 or 240 degrees. Converter full scale 36 is +/-1; A = 0.5 (-6.02 dBFS). Converters are mid-tread quantizers with 37 clipping (`bits = 0` means ideal). 38 39 Addition is phasor multiplication (theory 6.1, 6.2). Three candidate 40 realizations: 41 42 | rz_id | mechanism | where the multiply happens | 43 |---|---|---| 44 | PT_corr_product | two channels emit a and b; each is I/Q-correlated at f_c; the two correlator outputs are multiplied | complex multiply of measured phasors (research note loopback) | 45 | PT_mixer | two tones enter an ideal analog mixer; the product is digitized and correlated at 2 f_c | analog multiply (simulated) | 46 | PT_nco | 32-bit phase words `a T + b T` (T = floor(2^32/3)) wrap-add; one tone at that phase | integer phase accumulator (NCO) | 47 48 Measurement: `I = sum x[n] cos(2 pi n / 64)`, `Q = -sum x[n] sin(2 pi n / 64)` 49 (bin 2 for mixer and doubler). Decision: `k = mod(round(theta / 120 deg), 3)`, 50 cells +/-60 degrees. 51 52 Calibration (research note "Timing and calibration"): every 53 `interval` operations, emit k = 0 on each path `reps` times, average the 54 correlator outputs, store the phase as the path offset and the magnitude as 55 the erasure reference; then emit k = 1 `reps` times and require 56 120 +/- `tol` degrees after correction, else a calibration fault. Later 57 correlator outputs are rotated by the stored offset. The reference is 58 time-multiplexed on the signal paths (the research note's procedure); a 59 dedicated always-on pilot tone is the hardware alternative and is not modelled. 60 61 Flags (each fails the trial; no voting): erasure (magnitude below 0.3 x 62 reference), reject (output phase more than 30 degrees from the nearest 63 center), calibration fault (every operation in a block after a failed check). 64 65 Noise and impairments: AWGN per sample at the ADC input (std `sigma`, 66 independent per channel); one Gaussian phase jitter per channel per frame; 67 DAC and ADC quantization; fixed per-channel path offset; linear per-channel 68 drift in simulated time (`frame_s` per frame, calibration frames included). 69 Symbol SNR at the correlator output is `rho = A^2 N / (4 sigma^2)`, equal to 70 the research note's `rho = N SNR_1 / 2`. 71 72 Declared simplifications: the analog path is a pure phase shift at f_c applied 73 before the DAC; noise is white Gaussian; converters have no INL/DNL or spurs; 74 mixer and doubler are ideal multipliers; one shared clock (no sample slip, no 75 frequency offset); no crosstalk; no amplitude drift. 76 77 RNG: xoshiro256** seeded by splitmix64, Gaussian by the Marsaglia polar 78 method, fixed seed per scenario (listed in the receipt). No clock or host data 79 enters the receipt except the recorded commit, dirty count and compiler 80 version, so plain and sanitizer builds write byte-identical receipts. 81 82 ## Profiles 83 84 | profile | f_s | N | bits DAC/ADC | use | 85 |---|---|---|---|---| 86 | A | 125 MS/s | 4096 | 14/14 | research note reference design | 87 | B | 1 MS/s | 1024 | 12/12 | research note low-rate design | 88 | B-ideal | 1 MS/s | 1024 | ideal | quantization-free control | 89 | SWEEP | 1 MS/s | 64 | ideal | gate 2; flags, jitter, offset, calibration off | 90 | P (contract) | 1 MS/s | 64 | 12/12 | gate 3; frame 128 us, rho 25 dB per input, jitter 1 deg rms, flags on, calibration every 1000 ops with 32 reference frames, tol 5 deg | 91 92 ## Pre-registered gates and thresholds 93 94 These thresholds are fixed in this document and in `tests/algebra/test_phase_twin.c` 95 before the committed receipt is generated. 96 97 - **Self-checks.** Decoder boundaries (59.9 degrees -> 0, 60.1 -> 1), NCO wrap 98 pair (2,2) -> 1, argument rejection, RNG moments, the analytic add reference 99 stable between grids of 3600 and 7200 points (relative 1e-3), Craig integral 100 at 0 dB within 5e-4 of 0.1834. 101 - **Gate 1, noiseless (exhaustive).** Profiles A, B, B-ideal x realizations 102 PT_corr_product, PT_mixer, PT_nco: all 9 input pairs x 1000 repetitions 103 decode equal to `oma_z3_add`, zero mismatches, zero flags. Multiply by a known 104 constant on profile B (calibration on): 9 pairs x 1000 equal to `oma_z3_mul`. 105 Quantization sweep 16 to 1 bits is informational only. 106 - **Gate 1b, research note pass condition.** Profile A, `SNR_1` = 80 dB per 107 sample, 1 ps jitter (7.0e-4 degrees at 1.953 MHz), 3.35 degree fixed offset 108 on channel b (1 m cable), calibration on: 9 x 1000, zero failures. 109 - **Gate 2, error rate versus SNR (PT_corr_product, profile SWEEP).** At rho 110 = 0, 6, 8, 10, 12 dB per input with 1e5, 2e5, 4e5, 1e6, 4e6 trials: 111 (a) the exact add reference (numerical circular convolution of the exact 112 PSK phase density, 7200 points) lies inside the measured Wilson 99.9 % 113 interval; (b) the research note's Monte Carlo add values (3.52e-1, 5.76e-2, 114 1.52e-2, 1.96e-3, 8.46e-5) are within 5 % of the exact reference at 10 and 115 12 dB; (c) the single-phasor read of channel a matches Craig's exact 3-PSK 116 error inside Wilson 99.9 % wherever at least 100 errors are expected, and 117 Craig matches the research note's table within 1 %; (d) pure 15 degree 118 per-input jitter, 4e5 trials: `2 Q(60 / (sqrt2 x 15))` = 4.68e-3 inside 119 Wilson 99.9 %. 120 - **Gate 3, calibration (profile P).** Cases offset-only (50, 20 degrees), 121 drift-only (2.0, 1.5 degrees/s), offset and drift. Uncalibrated runs 122 (2e5, 1e6, 2e5 trials) must **violate** the contract: Wilson 95 % lower 123 bound above 1e-6. Calibrated runs (2e5, 1e6, 4e6 trials) must have zero 124 failures. The contract case (offset and drift, 4e6 trials) must meet the 125 contract below. 126 - **Gate 4, receipt.** Records every profile parameter, the contract, measured 127 error rates with Wilson bounds, evidence tiers per ADR 0019 section 8, the 128 Z3 multiply verdict, and field names from `src/turing/field.h` where they 129 apply (`rz_id`, `algebra`, `representation`, `tier_source`, `run_id`, 130 `git_commit`, `tree_dirty`, `toolchain`, `verified`). 131 132 Contract (ADR 0018 `BOUNDED_STOCHASTIC`): operation Z3 add `(a + b) mod 3`, 133 realization PT_corr_product at profile P; bound: probability of a failed 134 operation (mismatch or any flag) <= 1e-6; confidence 95 %; required: zero 135 failures in at least `ceil(-ln 0.05 / 1e-6)` = 2,995,733 trials, and the 136 two-sided Wilson 95 % upper bound <= 1e-6 (hence 4,000,000 trials). 137 138 ### Pre-registration record 139 140 The thresholds above were written into the test code before the first full 141 run, but that run (uncommitted working tree) came before this document. One 142 parameter changed after it: profile P first used 8 calibration reference 143 frames. At rho 25 dB the k = 1 check then misfires about once per 4,000 144 calibrations (6e-5 per check); one such false calibration fault flagged a 145 block of 1,000 operations in the drift-only and contract cases. The frame 146 count was raised to 32, which puts the check tolerance at about 8 standard 147 deviations. The contract bound, confidence, SNR, trial counts, tolerances and 148 flag thresholds did not change. This is a post-observation change to a 149 calibration parameter and is recorded here as such. 150 151 ## Z3 multiplication 152 153 Two unknown operands: **not realizable in this model.** Phasor multiplication 154 realizes Z3 addition. Z3 `a b` corresponds to `w^(a b) = (w^a)^b`, which is 155 exponentiation, and no bilinear phasor operation computes it (theory 6.4). A 156 decode-then-select circuit (decode b digitally, then identity, doubler or 157 constant source) is a hybrid digital realization and is not claimed. 158 159 Multiplication by a known constant b: **realized** (gate 1): b = 0 is a constant 160 k = 0 source, b = 1 identity, b = 2 a frequency doubler (squarer read at 161 2 f_c), since `w^(2a) = conj(w^a)`. 162 163 ## Evidence tiers (ADR 0019 section 8) 164 165 | item | tier | scope | 166 |---|---|---| 167 | add, noiseless, each profile x realization | E3 (all 9 pairs) | the twin model; the ideal map itself is E4 (theory 6.1 proof) | 168 | mul by known constant, noiseless | E3 | the twin model | 169 | add, bounded contract at profile P | E1 | the twin model only | 170 | SNR curve and jitter check | model validation, not a contract | agreement with analytic references | 171 | mul of two unknowns | E0: no realization exists | | 172 173 ## What the twin proves and what it does not 174 175 It shows that, inside the declared model, the phase encoding plus the three 176 add mechanisms compute exactly `oma_z3_add` on the whole Z3 domain; that 177 the decoder's error statistics match the analytic 3-PSK results, so the 178 contract arithmetic is right; and that the reference-frame calibration turns 179 a failing channel (offset and drift) into one that meets a 1e-6 bound at 180 rho 25 dB. 181 182 It does **not** show that any physical board does this. ADR 0018 forbids a 183 physical analog claim without physical evidence, and there is none. It makes 184 no claim about speed, latency, energy, or cost against the digital 185 `oma_z3_add`. The noise models are idealized (list above); real converters, 186 cables, mixers and clocks have effects the twin leaves out. 187 188 ## What a real board must meet for the contract to transfer 189 190 A board inherits the twin's contract only if measurements (AR4 evidence) 191 show all of these at the operating point used: 192 193 1. One clock and PLL for DAC, ADC and NCOs; NCOs cleared on the same cycle; 194 no sample slip (one sample at `f_s / 64` is 5.625 degrees). 195 2. Symbol SNR at the correlator output >= 25 dB per input: 196 `N SNR_1 / 2 >= 316`, measured with the board's effective bits, at -6 dBFS 197 and no clipping. 198 3. DAC and ADC >= 12 effective bits over the used band, no spur at f_c or 199 2 f_c above the noise that the SNR figure assumes. 200 4. Frame-to-frame phase jitter <= 1 degree rms per channel (1.42 ns rms at 201 1.953 MHz; 178 ns at 15.625 kHz). 202 5. Any fixed path offset, with the k = 1 check passing (120 +/- 5 degrees). 203 6. Phase drift <= 2 degrees/s per channel with recalibration every 1,000 204 operations (0.13 s at profile P), or proportionally faster recalibration; 205 board temperature within 2 degrees C across a block. 206 7. 32 reference frames per calibration step at rho 25 dB (fewer at higher 207 SNR, as long as the check's false-fault rate stays below the contract). 208 8. Noise white and Gaussian enough that the measured error curve matches the 209 gate 2 curve; independent channels; crosstalk below the noise floor. 210 9. For PT_mixer: mixer linear enough that the 2 f_c product term dominates, 211 and the ADC sees the product without clipping. 212 213 ## Results (receipt `evidence/MIXED_ALGEBRA/phase_twin_receipt.`5d6ca45e970faf19986490264e35db453211ffe6dfff03d1cfb10937f329a22b`.json`) 214 215 Generated by `make phase-twin-receipt` from clean commit `48ef003` (`tree_dirty` 0), 216 gcc 13.3.0. Overall **PASS**. The quick run (trial counts / 50) is byte-identical 217 between the plain and the ASan+UBSan build. 218 219 - Gate 1: 9 configurations (A, B, B-ideal x corr_product, mixer, nco), 9,000 220 checks each, 0 mismatches, 0 flags. Largest phase error from a cell center: 221 3.6e-2 degrees (mixer, 12-bit). Multiply by known constant: 9,000 checks, 0 222 failures. Quantization is harmless down to 2 bits (max 3.75 degrees); the 223 degenerate 1-bit mid-tread quantizer fails (informational). 224 - Gate 1b: 9,000 checks at the research note's reference operating point, 0 225 failures. 226 - Gate 2, PT_corr_product add error versus rho per input (exact reference / 227 research note / twin): 228 229 | rho | exact | note | twin (errors / trials) | Wilson 99.9 % | 230 |---|---|---|---|---| 231 | 0 dB | 3.517e-1 | 3.52e-1 | 3.531e-1 (35,314 / 1e5) | 3.48e-1 .. 3.58e-1 | 232 | 6 dB | 5.771e-2 | 5.76e-2 | 5.793e-2 (11,585 / 2e5) | 5.62e-2 .. 5.97e-2 | 233 | 8 dB | 1.514e-2 | 1.52e-2 | 1.526e-2 (6,104 / 4e5) | 1.46e-2 .. 1.59e-2 | 234 | 10 dB | 1.961e-3 | 1.96e-3 | 1.938e-3 (1,938 / 1e6) | 1.80e-3 .. 2.09e-3 | 235 | 12 dB | 8.530e-5 | 8.46e-5 | 9.125e-5 (365 / 4e6) | 7.68e-5 .. 1.08e-4 | 236 237 Single-phasor reads match Craig's formula (for example 1.020e-4 vs 1.065e-4 238 at 10 dB). Jitter 15 degrees per input: 4.68e-3 measured, 4.68e-3 formula. 239 - Gate 3 (profile P, contract bound 1e-6 at 95 %): uncalibrated offset-only, 240 drift-only and offset-and-drift runs fail at 1.00, 0.80 and 1.00 (contract 241 violated). Calibrated: 0 failures in 2e5, 1e6 and 4e6 operations; the 242 contract case gives Wilson 95 % upper bound 9.6e-7 and E1 bound 7.5e-7: 243 **CONTRACT_MET** under profile P. 4,000 calibrations, 0 calibration faults.