omega-mv
Omega: a language for verified programs, semantic identity and machine realization. Seed-born work and existing implementations have distinct provenance.
Brought by drakestapleton
omega-mv / spec / plan-reuse.md
| 1 | # Omega plan IR and verified plan cache (OMEGA_PLAN_REUSE) |
| 2 | |
| 3 | Code: `src/runtime/rx_plan.{c,h}` (plan IR, identity, cache, applicability, |
| 4 | lifecycle), `src/runtime/rx_plan_arrange.{c,h}` (one planning domain and the |
| 5 | AIEN planner for it). Test: `tests/runtime/rx_plan_reuse.c`, |
| 6 | `make test-plan-reuse`. Receipt: `evidence/PLAN_REUSE/`. |
| 7 | |
| 8 | This file was committed before the implementation. The gate criteria in §7 |
| 9 | are binding; the receipt reports measured values against them and never |
| 10 | relabels a miss. |
| 11 | |
| 12 | ## 1. Purpose |
| 13 | |
| 14 | Successful reasoning structure should be reusable. A plan is semantic |
| 15 | computation: a typed Omega action graph over World objects (`rx_graph.h`), |
| 16 | with the conditions under which it is valid and the evidence it must leave. |
| 17 | It is not prose and not a hidden chain of thought. |
| 18 | |
| 19 | The action graph IR (merged before this work) states its own limit: |
| 20 | "procedures are fixed templates; no learned planner". This work supplies the |
| 21 | other half: AIEN produces a plan by search when none applies; the plan is |
| 22 | executed as an action graph, verified, generalised into a slot-parameterised |
| 23 | template and stored. A later goal of the same shape retrieves the template, |
| 24 | checks that it applies, binds its slots and runs it without searching. |
| 25 | |
| 26 | ## 2. PlanTemplate |
| 27 | |
| 28 | ``` |
| 29 | PlanTemplate { |
| 30 | semantic_id SHA-256 of the canonical semantic bytes (§3) |
| 31 | goal_shape SHA-256 of the canonical goal shape (§4) |
| 32 | preconditions[] predicates over the goal object (kind, constraints) |
| 33 | required_state[] predicates over bound World objects (slots) |
| 34 | required_capabilities[] (slot, rights) the principal must already hold |
| 35 | required_resources RxResourceNeed per step and total energy |
| 36 | action_graph kind + digest; kind 1 = rx_graph AgGraph template |
| 37 | whose World objects are parameters 1..n (the slots) |
| 38 | variable_slots[] typed slots; the role each plays (goal / involved) |
| 39 | invariants[] predicates that must hold before and after the run |
| 40 | evidence_requirements evidence nodes of the graph; crumbs must verify |
| 41 | success_predicate predicates over slots after the run |
| 42 | failure_predicate graph FAILED, invariant broken, or evidence missing |
| 43 | applicability_predicate shape + preconditions + required state + |
| 44 | capabilities + resources + environment assumptions |
| 45 | + world generation + cognitive generation |
| 46 | ancestry origin (search, adapted, re-derived), parent ids, |
| 47 | producing goal, producing cognitive generation |
| 48 | verification_status CANDIDATE, VERIFIED, STALE |
| 49 | } |
| 50 | ``` |
| 51 | |
| 52 | Environment assumptions (for example "the station's arm is ready") are |
| 53 | predicates over named environment objects and are part of the plan's meaning. |
| 54 | |
| 55 | ## 3. Identity |
| 56 | |
| 57 | `semantic_id` = SHA-256 over `OMEGA_PLAN_TEMPLATE_V1` followed by canonical |
| 58 | bytes of: goal kind, goal shape, slots, every predicate list (each list sorted |
| 59 | by its canonical record bytes, so builder order does not matter), required |
| 60 | capabilities, required resources, action graph kind and digest |
| 61 | (`rx_graph_identify` over the unbound template; builder-order independent), |
| 62 | evidence requirements, failure predicate flags. |
| 63 | |
| 64 | Excluded: ancestry, verification status, counters, and everything about one |
| 65 | physical realization. A **realization** is one binding of the template in one |
| 66 | World: slot objects (id, generation), the capability references used, the |
| 67 | digest of the compiled and optimised graph, the world generation and the core |
| 68 | class the run was placed on. `realization_id` = SHA-256 over |
| 69 | `OMEGA_PLAN_REALIZATION_V1`, the semantic id and those fields. Many |
| 70 | realizations share one semantic id. |
| 71 | |
| 72 | The verification record (world generation and cognitive generation the |
| 73 | template was last verified under) belongs to the cache record, not to the |
| 74 | semantic id. A template re-derived under a new World generation has the same |
| 75 | semantic id; its record is re-verified, not duplicated. |
| 76 | |
| 77 | Canonical bytes round-trip: decode(encode(t)) re-encodes to identical bytes |
| 78 | and the same id. |
| 79 | |
| 80 | ## 4. Flow |
| 81 | |
| 82 | ``` |
| 83 | goal object (World) |
| 84 | -> derive goal shape (canonical, object identities abstracted) |
| 85 | -> retrieve candidate templates (cache index by goal shape) |
| 86 | -> check applicability (every axis of §5; first failing axis recorded) |
| 87 | -> bind variables (goal slots from the goal, involved slots by |
| 88 | following World references) |
| 89 | -> verify capability/resource conditions |
| 90 | -> execute (rx_graph compile, optimise, lower, run) |
| 91 | -> verify (success predicate, invariants, evidence, crumbs) |
| 92 | ``` |
| 93 | |
| 94 | When no template applies: AIEN plans by search over World predicates, |
| 95 | executes, verifies, and stores the generalised plan as a CANDIDATE. |
| 96 | |
| 97 | Every retrieval decision (accept, or refuse with its axis) is published to a |
| 98 | World decision object by the principal, so it leaves a causal crumb. |
| 99 | |
| 100 | ## 5. Applicability axes (no blind replay) |
| 101 | |
| 102 | | axis | refused when | |
| 103 | |---|---| |
| 104 | | shape | goal shape digest differs | |
| 105 | | binding | a slot cannot be bound, or a bound object is not live at that generation | |
| 106 | | goal constraints | goal kind differs, max steps below the plan's steps, energy budget below the plan's energy | |
| 107 | | required state | any required World predicate fails under the binding | |
| 108 | | authority | the principal's table has no capability that the World's authority view validates for a slot's required rights (never minted) | |
| 109 | | resources | a step's need does not fit the World's current budget | |
| 110 | | environment | an environment assumption predicate fails | |
| 111 | | world generation | the World generation differs from the one the template was verified under | |
| 112 | | cognitive generation | AIEN's cognitive generation differs from the one it was verified under | |
| 113 | |
| 114 | ### Lifecycle |
| 115 | |
| 116 | - A plan found by search that executes and verifies is stored **CANDIDATE**. |
| 117 | - A CANDIDATE reuse first runs the action graph's sequential reference |
| 118 | against a copy of the World (no effects). Only if the reference reaches |
| 119 | the success predicate is it executed. |
| 120 | - A reuse that executes and verifies promotes to **VERIFIED**. A VERIFIED |
| 121 | reuse skips the reference. |
| 122 | - A reuse that fails its success or failure predicate marks the template |
| 123 | **STALE** and is counted as a false applicability. STALE is never reused. |
| 124 | |
| 125 | ## 6. Planning domain and planner (what is and is not claimed) |
| 126 | |
| 127 | The domain is the classic arrangement ("blocks world") benchmark lifted onto |
| 128 | World objects. Unit objects (type 0x5B01) carry field 0 = what they rest on |
| 129 | (packed reference of another unit, 0 = floor) and field 2 = their own packed |
| 130 | reference. Moving a unit is a publication of field 0, authority-checked by |
| 131 | the engine under a capability the principal holds for that unit's resource. |
| 132 | |
| 133 | The AIEN planner is A* over the World projection of every live unit, with an |
| 134 | admissible heuristic (unsatisfied goal facts). It is a small explicit search |
| 135 | model over World predicates, not a neural model. The claim is the reuse |
| 136 | structure, not the planner's intelligence. |
| 137 | |
| 138 | A plan is generalised into a template: slots are goal objects plus every unit |
| 139 | the plan moves, moves onto, or that rests on a slot at the start (closure). |
| 140 | Required state: each slot's support relation (slot, floor, or a non-slot) and |
| 141 | "no non-slot unit rests on a slot". These are sufficient conditions for every |
| 142 | step of the plan to be legal and for the success predicate to follow. |
| 143 | |
| 144 | Adaptation: when a template of the goal's shape fails only on required state, |
| 145 | the planner searches for a short prefix that reaches the template's required |
| 146 | state, then runs prefix and template. Adaptation overhead is reported. |
| 147 | |
| 148 | ## 7. Gate OMEGA_PLAN_REUSE_PASS (binding) |
| 149 | |
| 150 | Workloads: two repeated goal shapes (reverse a tower; merge two towers), each |
| 151 | with at least 40 instances in fresh Worlds with different object identities |
| 152 | and distractor units. For every instance the first-use path (cache off, AIEN |
| 153 | search) runs in a mirror World built identically, and the reuse path runs in |
| 154 | its own World. |
| 155 | |
| 156 | "Cognitive operations" = planner states expanded + successors generated + |
| 157 | heuristic evaluations (first use); goal-shape operations + candidates |
| 158 | retrieved + predicates evaluated + binding attempts (reuse). Cognition CPU |
| 159 | time = thread CPU time from goal read to a graph ready to compile. |
| 160 | |
| 161 | | # | criterion | |
| 162 | |---|---| |
| 163 | | G1 | per shape, median cognitive operations: reuse <= first use / 20 | |
| 164 | | G2 | per shape, median cognition CPU time: reuse <= first use / 10 | |
| 165 | | G3 | every accepted reuse succeeds: success predicate, invariants, all evidence nodes carry evidence, crumbs verify; the outcome equals the first-use outcome (same goal facts hold, same number of steps, same number of evidence words) | |
| 166 | | G4 | false applicability = 0 over all accepted reuses, and at least 80 adversarial goals of a stored shape across the 9 axes of §5 (at least 8 per non-shape axis) are all refused, each refusal published as a World decision (crumb present) | |
| 167 | | G5 | identity: canonical round-trip; semantic id invariant under builder order and binding; a change to any semantic field changes it; two bindings give two realization ids and one semantic id; re-derivation under a new World generation yields the same semantic id | |
| 168 | | G6 | per shape, median end-to-end latency (goal to verified outcome): reuse < first use | |
| 169 | |
| 170 | Reported, not gated: instructions retired (perf counter, when available), |
| 171 | package energy per cognition (SPBM hwmon, whole package, machine not quiet), |
| 172 | adaptation overhead versus full search, what blind replay (no applicability |
| 173 | check) does on each adversarial axis, lifecycle transitions. |
| 174 | |
| 175 | ## 8. Limits |
| 176 | |
| 177 | - One planning domain. The plan IR and cache are domain-independent; the |
| 178 | goal-shape derivation, planner and generaliser are per domain. |
| 179 | - Templates live in a host-side store; only the decision and index records |
| 180 | are World objects. Durability through R9 is not claimed. |
| 181 | - A template's graph must fit the action graph's 64 nodes. |
| 182 | - Host processor only; no graphics processor run is claimed. |
| 183 | - Cognition (goal shape, retrieval, applicability, AIEN's search) reads a |
| 184 | consistent host projection of the World taken under the world lock, not |
| 185 | through capabilities. Execution is capability-checked by the engine. |
| 186 | - First-use cognition includes hashing the new template's identity, which a |
| 187 | system without a cache would not do. The receipt also reports the CPU |
| 188 | ratio with that hash excluded. |
| 189 | - Two workloads can share one goal shape (both build one six-unit tower); |
| 190 | their templates differ in required state. Every candidate of the shape |
| 191 | is checked and each refusal is recorded. |
| 192 | |
| 193 | ## 9. Owner decision (2026-09-28, after the qualification run) |
| 194 | |
| 195 | The pre-registered verdict is FAIL: G1 required 20x fewer cognitive |
| 196 | operations for every workload, and the reverse-tower workload measured 1.2x |
| 197 | (its goal is too easy for the planner to leave reasoning to save). The |
| 198 | task's own gate asks for at least one repeated workload; merge-two-towers |
| 199 | meets it (26.6x fewer operations, outcome and evidence equal to first use, |
| 200 | 0 false applicability). The owner chose to judge the gate by the task's |
| 201 | wording and merge. The receipt keeps both verdicts; neither is relabelled. |