M20 fixture table (all_pass)
Qualification checklist (plan E2)
| Item | Status | Evidence |
|---|---|---|
| Shape / type checks | PASS (CPU) | test-tensor |
| CPU parity | PASS (CPU) | test-tensor |
| Mutation / refusal | PASS (CPU) | test-tensor-mutations |
| CI | WIRED | hosted runner, not a qualification |
| E1 numeric closure | PASS (on main) | E1 receipt |
M20 verdict: fixture.
Open seams
| Not | NOT_RUN | rows after the verdict are ignored |