Interplane page as plain text, for reading tools and agents. English is the reference text: translate it with your own tool. Text in backticks and in ``` blocks (commands, fingerprints, file names) and link targets in <...> are exact: copy them, never translate them. Page: /drakestapleton/spark-rsi-mv/blob/main/docs/plans/2026-10-12-evidence-driven-rsi-cut.md # spark-rsi-mv Native Rust recursive self-improvement engine with paired bootstrap evaluation and cryptographic ledger Brought by drakestapleton Sign in to star 0 stars 0 watching About Files History Releases Proposed changes Issues For developers branch `main` Branches Tags History `spark-rsi-mv / docs / plans / 2026-10-12-evidence-driven-rsi-cut.md` 218 lines ยท 15379 bytes Raw Blame History Rendered 1 # Evidence-Driven RSI: the M1 + M2 cut 2 3 Status: approved plan, no code yet. Decided by Drake in a three-round design grilling on 2026-10-12. 4 Supersedes, for implementation purposes, the broader brief "AIEN Development Brief: Evidence-Driven Autonomous Engineering". 5 6 ## The one rule above everything 7 8 **No candidate-controlled statement can independently establish that a canary passed.** 9 10 A candidate may answer a challenge. The supervisor must have sent that challenge, must measure the elapsed time 11 itself, must compare the answer against independently defined expectations, and must durably commit the verified 12 observation. Only the existing admission and promotion authorities act on that evidence. Tests that let a worker 13 self-report success into production admission are defects and must be rewritten. 14 15 **Every accepted canary observation must be demonstrably tied to the exact executable that was built, 16 independently checked by the supervisor, and admitted through one authoritative promotion path.** 17 18 Fixture qualification and production safety qualification are different things. Ten verified fixture requests 19 prove the canary mechanism works. They do not establish that every existing safety evaluator is ready to authorize 20 production changes; see the safety-envelope defect below. 21 22 ## Scope 23 24 In scope, this cut only: 25 26 - **M1 Measurement.** Replace the hardcoded capability-graph numbers in `src/daemon.rs` with measured RSI stage 27 timings from completed prior cycles. 28 - **M2 Execution and admission.** Make `admit_production_quota` receive real, authenticated, supervisor-driven 29 observations instead of an empty slice. 30 31 Deferred, not authorized here: objective discharge (M3), residual-unknown registry (M4), RSI and explanation 32 interoperability (M5), REA investigation adapter (M6, filed as a mind-map idea). 33 34 ## Pinned baseline 35 36 | Repository | Commit | 37 |---|---| 38 | spark-rsi | ``f74a7dbdcd06`` | 39 | aien-sovereign-core | ``b323258396a9`` | 40 | aien-protocols | ``5c2316954e16`` | 41 | aienos | ``5cfba1bba3f8`` | 42 43 ## Verified defects at the baseline 44 45 - `src/daemon.rs` builds the capability graph with constant latency and memory values per node. 46 - `src/daemon.rs` calls `admit_production_quota(&[], ...)`; the quota can never be met. 47 - `src/supervisor/daemon.rs` discards `transaction_id` on `CanaryReport`, so replays count. 48 - The `CanaryReport` branch checks only the generation name, not whether that connection completed the handshake. 49 - `CanaryReport` carries worker-supplied success and latency, which go straight into `record_canary_transaction`. 50 - `run_cycle` stages a generation but never calls `spawn_worker` and never runs a canary workload. 51 - `HostSupervisor::record_canary_transaction` and `process_worker_message` both grant `Durable` on a counter. 52 - Handling `Ready` switches `active.sock` to the candidate before any admission decision. 53 - `rank_bottlenecks` sorts by score with no tie-break; non-finite scores compare as equal. 54 - `wait_for_readiness` returns success on any socket connection, even with no PONG or READY reply at all. 55 - `record_canary_transaction` treats a failed memory-budget read as within budget (`unwrap_or(true)`). 56 - `stage_canary` only copies the candidate directory; nothing compiles, launches or drives an executable. 57 - The candidate digest passed to the quota validator is the hash of `proposal.proposed_patch`, not of the 58 evaluated tree or the executable launched. 59 - `admit_production_quota` checks only non-empty id and status, candidate digest match, the `Measured` label and 60 duplicate consistency. It does not check that the status is a verified success. 61 - `CanarySafetyEnvelope` runs its probes through `DeterministicReferenceBackend` on the production call path, so its 62 signed result is a reference evaluation, not independently established production safety. 63 - The hypothesis contract is built from the graph's `latency_p95_us`, so a cold-start cycle can claim a measured 64 latency target from invented numbers. 65 - Every winning proposal, whatever its kind, is sent into the canary path. 66 67 ## Decisions 68 69 ### Terminology 70 71 - **Closure** keeps its existing meaning: the `aien-closure` / `verify-closure` dependency-graph proof check. 72 - **Discharge** is the new word for "an objective's required outcomes all have qualifying evidence". Deferred. 73 - An **obligation**, when it arrives, is an `aien-proof` Gate `Requirement` extended with an obligation id, an 74 objective id and an out-of-scope disposition. No new evaluator. 75 76 ### M1 Measurement 77 78 - Measure RSI's own pipeline stages (Observe, Propose, BuildJail, JudgeEvaluation, SupervisorCanary, CortexCommit), 79 not the inference runtime. 80 - Ranking in a cycle uses samples from **completed prior cycles**, never the current one. 81 - Samples persist in an append-only stage-sample log under the RSI state directory, one record per cycle: 82 cycle id, workload key, execution-profile fingerprint, per-stage duration and outcome, source commit, schema 83 version. Failed and partial cycles are recorded in a separate partial-cycle set, never mixed into eligible samples. 84 - **Workload key**: normalized target repository identity, effective execution configuration, model name. 85 The target commit is recorded for provenance but is not part of the key. 86 - **Execution-profile fingerprint**: model name, effective execution configuration, CPU count, memory capacity, 87 GPU identity (`none` when absent). Canary adapter protocol version is recorded on canary-stage samples only. 88 `require_latency_improvement` is an evaluation policy and is not an execution mode. 89 - **Sufficiency**: at least 3 compatible completed samples per stage from the most recent 20 compatible cycles. 90 Both numbers are configuration. 91 - **Statistics**: median is the ranking input and is reported under its own name. Empirical p95 is reported only 92 with at least 20 valid compatible samples; otherwise p95 is marked unavailable. One percentile algorithm, 93 golden-tested. Zero never means missing: unavailable is an explicit state, with backward-compatible graph output. 94 - **Cold start**: rank on graph topology (betweenness centrality) only; latency and error terms are marked 95 unavailable in the explanation. No "measured improvement" hypothesis may be generated from missing data: the 96 hypothesis contract carries a numeric latency target only when the stage's latency is measured, otherwise it is 97 an exploratory hypothesis with no performance claim. 98 - **Canary applicability** is policy-controlled by proposal kind and claim: executable production changes always 99 go through canary admission; documentation and other non-executable changes may be exempted by explicit policy, 100 never by default. Exemption never weakens the gates for anything that reaches production. 101 - **Claims**: a proposal of kind `Optimization`, or any proposal when `require_latency_improvement` is on, needs a 102 measured diagnosis before promotion. Other kinds proceed on structural ranking. 103 - **Ordering**: score descending, then stage id ascending. Non-finite measurements are rejected before scoring. 104 - Removing measurements can never restore the old constants. Those constants are deleted. 105 106 ### M2 Execution 107 108 - **Adapter manifest**: a target is eligible for canary only if it ships a declared canary adapter manifest naming 109 the approved executable, arguments, protocol version, request workload and expected-response format. Unsupported 110 targets fail closed. The supervisor verifies the executable is the exact built artifact under evaluation. 111 - **Wire protocol**: a small versioned supervisor-to-worker execute-request / result message pair added to the IPC 112 enum. Worker `CanaryReport` self-reports become diagnostics only. 113 - **Workload**: a digest-pinned canary manifest under the RSI state directory with requests, expected outcomes, 114 deadlines and permitted nondeterminism. The candidate cannot rewrite it or set its own passing criteria. 115 - **Candidate identity** is a bound chain: source patch digest, evaluated tree digest, built executable digest, 116 generation id. The supervisor launches only the executable whose digest is in that chain, and every observation 117 carries the executable digest. The quota validator compares against the executable digest, not the patch digest. 118 - **Readiness** means a valid versioned READY reply on the authenticated generation socket within the deadline. 119 A bare connection, silence or an unknown reply is not ready. 120 - **Observation** binds: generation id, issued request id, request digest, workload digest, candidate executable 121 digest, observed result digest, supervisor-measured elapsed time, supervisor timestamp, verified status, 122 provenance. 123 - **Observation id**: domain-separated hash of (generation id, request id, request digest). Duplicates collide by 124 construction; the store refuses known ids; conflicting records for one id are a verification failure. 125 The supervisor tracks issued requests; an unsolicited response creates nothing. Incomplete requests after a 126 restart are never counted as successes. 127 - **Authentication**: per-connection state `Unauthenticated -> Authenticated(generation_id)` set only by a 128 successful HMAC handshake. Messages on unauthenticated connections or for another generation are rejected and 129 the connection closed, logged as rejected, with no rollback. A worker timeout still fails the canary. 130 - **Storage**: per-generation append-only observation log, sealed with a final digest record. Partial trailing 131 records are detected and excluded. The sealed log digest is committed to the RSI ledger before admission. 132 - `active.sock` is **not** switched on `Ready`. The candidate is exercised through its generation socket. 133 134 ### M2 Admission 135 136 - The quota validator (`admit_production_quota`) is the single authority on evidence sufficiency. 137 `record_canary_transaction` and `process_worker_message` stop granting `Durable`. 138 - Sequence: Collect -> Seal -> Verify -> Quota admission -> Safety envelope -> Judge / promotion gate -> Durable. 139 - The quota validator additionally requires each observation's verified status to be a supervisor-confirmed success 140 with a result digest matching the workload's expected outcome. Only observations from the new execution protocol 141 are eligible; the old `CanaryReport` path cannot produce one. 142 - Early safety reverts on a failed or slow request remain in the supervisor. 143 - A failed resource read is not proof that memory is within budget: a memory-budget read error reverts, it never 144 passes. 145 - The safety envelope stays in the sequence, but its reference-backend evaluation is recorded as such. The 146 qualification report must state plainly that production safety evaluation is not yet independently established. 147 Replacing or qualifying that evaluator is a separate follow-on cut, not part of M2. 148 149 ### Narrow contract freeze 150 151 - This file pins the four commits above. 152 - Golden tests, written before implementation, fix: (1) canonical canary-observation encoding and digest for the 153 new versioned record, (2) existing signed evaluation receipt bytes, digest and verification, (3) existing ledger 154 record encoding, hash and validation. Historical formats are untouched; new records carry their own version. 155 156 ## Implementation sequence and ownership 157 158 1. **Contract foundation** (orchestrator, before any worker starts): adapter manifest format, wire protocol, 159 observation schema and canonical encoding, durable log format, sealed-log hand-off interface to the quota 160 validator, golden tests. 161 2. **M1 Measurement** (worker A): stage instrumentation, sample log, compatibility filtering, cold start, 162 deterministic ranking, explanation marks unavailable values via the existing `MissingDoc` reason field. 163 3. **Harden the supervisor** (worker B, first half): strict readiness, generation binding, per-connection session 164 authentication, no `active.sock` switch on Ready, memory-read failure reverts. 165 4. **M2 Execution** (worker B, second half): fixture crate implementing the adapter, supervisor-driven timed 166 requests, independent result checking, replay protection, observation storage and sealing. 167 5. **M2 Admission** (worker C, the only worker that edits `src/daemon.rs`): build-artifact identity chain, wire 168 `spawn_worker` and the request loop into `run_cycle`, remove premature durability, ledger commitment, quota 169 integration with verified-success checks, canary applicability policy, rewrite self-report tests. 170 6. **Qualification**: adversarial CI plus one real DGX Spark run against the fixture crate, with the evidence 171 package attached to the pull request and remaining production limitations stated in the report. 172 173 Workers run on Sonnet. Daemon changes land serially: A, then C. 174 175 ## Qualification fixture 176 177 A dedicated Rust fixture crate inside this repository implementing the adapter protocol. It must be able to: 178 answer correctly, answer wrongly, fabricate self-reported success, send duplicate responses, replay after restart, 179 time out, return a wrong digest, and attempt premature promotion. Defaults for the fixture run: 10 supervisor-issued 180 requests, 2-second deadline each, both configurable. The real run must include at least one failing request. 181 182 A passing fixture run qualifies the canary execution pipeline. It does not qualify RSI's ability to improve 183 itself, and it does not qualify the safety envelope as a production evaluator. Both are later targets, with 184 spark-rsi as the first real adapter. 185 186 ## Evidence package for the qualification pull request 187 188 Pinned workload manifest and digest, complete sealed observation log and its digest, matching ledger commitment, 189 candidate artifact identity, quota decision, safety-envelope and promotion decisions, the CI run showing the 190 exact revision and tests executed. 191 192 ## Acceptance 193 194 - M1: different valid sample sets change the ranking deterministically; removing samples yields the cold-start 195 structural ranking with unavailable markers, never the old constants; explanation output distinguishes measured 196 from unavailable. 197 - M2: an authorized fixture with enough genuine supervisor-driven observations passes the quota and reaches the 198 later gates. Zero observations, self-reports only, duplicates, replays, wrong outputs, mismatched candidate 199 digests, corrupted logs, timeouts and unauthenticated connections cannot qualify. Fail-closed behaviour is never 200 weakened. 201 202 ## Delivery status (2026-10-12) 203 204 All six steps are implemented on the integration branch `feat/evidence-driven-rsi-cut` 205 (pull request #44, stacked on the plan pull request #38): 206 207 | Step | Delivery | Ticket | 208 |---|---|---| 209 | 1 Contract foundation | `src/canary/`, `docs/CANARY-CONTRACT.md`, golden tests (`b13ea46`) | #39 | 210 | 2 M1 Measurement | `src/measure/`, measured graph, exploratory hypotheses (PR #45) | #40 | 211 | 3 and 4 Supervisor hardening, M2 execution | `src/supervisor/canary_exec.rs`, `fixtures/canary-target` (PR #46) | #41 | 212 | 5 M2 Admission | identity chain, executor and quota wired into `run_cycle` (PR #47) | #42 | 213 | 6 Qualification | `examples/canary_qualification.rs`, `evidence/rsi-cut-2026-10-12/REPORT.md` | #43 | 214 215 The qualification report states what the fixture run qualifies and the remaining production 216 limitations. The one that matters most: the promotion gate refuses every candidate until the 217 separate judge is wired in (#35), so nothing becomes durable in this cut. That is fail closed by 218 design.