aien-architecture-mv
Canonical architecture for the AIEN ecosystem: flows, boundaries, ADRs, and the map from design to implementation repositories.
Brought by drakestapleton
aien-architecture-mv / PLAN_AUTHORITY.md
| 1 | # AIEN Plan Authority |
| 2 | |
| 3 | **Status:** AUTHORITATIVE |
| 4 | **Effective:** 2026-09-27 |
| 5 | |
| 6 | AIEN has accumulated architecture reviews, roadmap snapshots, implementation plans, milestone plans, and research plans. They are useful historical records, but they are not allowed to compete as active instructions. |
| 7 | |
| 8 | ## The three whole-system authorities |
| 9 | |
| 10 | 1. **Architecture:** `doctrine/ARCHITECTURE.md` |
| 11 | Defines what the system is, subsystem ownership, permanent boundaries, and canonical terminology. |
| 12 | |
| 13 | 2. **Milestone registry:** `doctrine/ROADMAP.md` |
| 14 | Owns canonical milestone identifiers and milestone status. Historical milestone names remain immutable even when a subsystem is later renamed. |
| 15 | |
| 16 | 3. **Execution sequence:** `CURRENT_EXECUTION_PLAN.md` |
| 17 | Defines what the project should do now and in what order. This is the only active cross-project master implementation plan. |
| 18 | |
| 19 | No other file may present itself as the canonical, master, final, complete, authoritative, or current whole-system plan. |
| 20 | |
| 21 | ## Component-local plans |
| 22 | |
| 23 | Component repositories may keep local roadmaps and acceptance specifications for their own scope. They must not redefine the whole-system architecture or duplicate the cross-project execution sequence. |
| 24 | |
| 25 | Examples: |
| 26 | |
| 27 | - `aien-dev/aienux/ROADMAP.md` is the Aienux component roadmap. |
| 28 | - Omega milestone specifications define acceptance contracts for individual Omega milestones. |
| 29 | - Historical Physics/Forge milestone specifications and receipts remain evidence records. |
| 30 | - A finite workstream plan under `docs/plans/` is allowed only when its scope is explicit and it is marked **NOT A MASTER PLAN**. |
| 31 | |
| 32 | When a component plan conflicts with these authorities, this repository wins for architecture and cross-project sequencing. Current implementation code and evidence still win for claims about what is actually implemented. |
| 33 | |
| 34 | ## Historical plan archive |
| 35 | |
| 36 | Superseded whole-system plans live under: |
| 37 | |
| 38 | `docs/archive/plans/` |
| 39 | |
| 40 | Every archived file carries a **SUPERSEDED / HISTORICAL** banner. Archived files are provenance, not instructions. |
| 41 | |
| 42 | Agents must not: |
| 43 | |
| 44 | - derive current milestone status from archived plans; |
| 45 | - reopen settled architecture because an archived document used older terminology; |
| 46 | - treat historical PHYSICS names as a reason to undo the FORGE rename; |
| 47 | - infer implementation status from a plan instead of current code/evidence. |
| 48 | |
| 49 | ## Naming rule: PHYSICS -> FORGE |
| 50 | |
| 51 | As of 2026-09-27, the current machine-realization subsystem is **FORGE**. |
| 52 | |
| 53 | Historical identifiers such as `PHYSICS_BOOT`, `PHYSICS_EFFECTS`, `PHYSICS_ACCELERATOR_LINK`, old receipt fields, old artifact names, and old repository history remain unchanged. They describe what existed at the time. |
| 54 | |
| 55 | Current architecture uses: |
| 56 | |
| 57 | `ATLAS AWAKENS. ALLEN INTENDS. AIEN PROPOSES. OMEGA DEFINES. FORGE REALIZES. AEGIS VERIFIES. HARDWARE ACTS. EVIDENCE TEACHES.` |
| 58 | |
| 59 | This sentence is responsibilities and causal dependencies, not a turn order and not the way a reaction result is accepted. FORGE is a realization and memory policy; the accept chain is World -> J-Space -> `compose.verify` -> commit -> Cortex (ADR 0016 Amendment 1, 2026-10-02). |
| 60 | |
| 61 | The repository `aien-spark/physics` remains a historical/current implementation location until its GitHub repository rename is performed. A repository-name transition does not rewrite old evidence. |
| 62 | |
| 63 | ## Change discipline |
| 64 | |
| 65 | A proposed change to whole-system sequencing must update `CURRENT_EXECUTION_PLAN.md`. |
| 66 | |
| 67 | A proposed change to subsystem responsibility must be recorded as an ADR and reflected in `doctrine/ARCHITECTURE.md`. |
| 68 | |
| 69 | A milestone status change must update `doctrine/ROADMAP.md` and cite evidence or an explicit corrective-reopen decision. |
| 70 | |
| 71 | If a new document appears to be another master plan, stop and fold the useful material into the existing authority instead. |