AIEN Plan Authority
Status: AUTHORITATIVE
Effective: 2026-09-27
AIEN has accumulated architecture reviews, roadmap snapshots, implementation plans, milestone plans, and research plans. They are useful historical records, but they are not allowed to compete as active instructions.
The three whole-system authorities
- Architecture:
doctrine/ARCHITECTURE.md
Defines what the system is, subsystem ownership, permanent boundaries, and canonical terminology. Milestone registry:
doctrine/ROADMAP.md
Owns canonical milestone identifiers and milestone status. Historical milestone names remain immutable even when a subsystem is later renamed.Execution sequence:
CURRENT_EXECUTION_PLAN.md
Defines what the project should do now and in what order. This is the only active cross-project master implementation plan.
No other file may present itself as the canonical, master, final, complete, authoritative, or current whole-system plan.
Component-local plans
Component repositories may keep local roadmaps and acceptance specifications for their own scope. They must not redefine the whole-system architecture or duplicate the cross-project execution sequence.
Examples:
aien-dev/aienux/ROADMAP.mdis the Aienux component roadmap.- Omega milestone specifications define acceptance contracts for individual Omega milestones.
- Historical Physics/Forge milestone specifications and receipts remain evidence records.
- A finite workstream plan under
docs/plans/is allowed only when its scope is explicit and it is marked NOT A MASTER PLAN.
When a component plan conflicts with these authorities, this repository wins for architecture and cross-project sequencing. Current implementation code and evidence still win for claims about what is actually implemented.
Historical plan archive
Superseded whole-system plans live under:
docs/archive/plans/
Every archived file carries a SUPERSEDED / HISTORICAL banner. Archived files are provenance, not instructions.
Agents must not:
- derive current milestone status from archived plans;
- reopen settled architecture because an archived document used older terminology;
- treat historical PHYSICS names as a reason to undo the FORGE rename;
- infer implementation status from a plan instead of current code/evidence.
Naming rule: PHYSICS -> FORGE
As of 2026-09-27, the current machine-realization subsystem is FORGE.
Historical identifiers such as PHYSICS_BOOT, PHYSICS_EFFECTS, PHYSICS_ACCELERATOR_LINK, old receipt fields, old artifact names, and old repository history remain unchanged. They describe what existed at the time.
Current architecture uses:
ATLAS AWAKENS. ALLEN INTENDS. AIEN PROPOSES. OMEGA DEFINES. FORGE REALIZES. AEGIS VERIFIES. HARDWARE ACTS. EVIDENCE TEACHES.
This sentence is responsibilities and causal dependencies, not a turn order and not the way a reaction result is accepted. FORGE is a realization and memory policy; the accept chain is World -> J-Space -> compose.verify -> commit -> Cortex (ADR 0016 Amendment 1, 2026-10-02).
The repository aien-spark/physics remains a historical/current implementation location until its GitHub repository rename is performed. A repository-name transition does not rewrite old evidence.
Change discipline
A proposed change to whole-system sequencing must update CURRENT_EXECUTION_PLAN.md.
A proposed change to subsystem responsibility must be recorded as an ADR and reflected in doctrine/ARCHITECTURE.md.
A milestone status change must update doctrine/ROADMAP.md and cite evidence or an explicit corrective-reopen decision.
If a new document appears to be another master plan, stop and fold the useful material into the existing authority instead.