interplane.Get Omega
Read in your language

aien-architecture-mv

Canonical architecture for the AIEN ecosystem: flows, boundaries, ADRs, and the map from design to implementation repositories.

Brought by drakestapleton

branch main Branches Tags History

aien-architecture-mv / funding / tais-2026-memory-safety / GOVERNANCE.md

32 lines · 3329 bytes Raw Blame History Source

Grant controls, source evidence and financial reporting

This research program is an unfunded proposal. No Manifund grant or outside funding is claimed by these files. No external research institution, security firm, named auditor or supplier has agreed to participate.

Stage-gated funding

Actual releases follow donors' and grant administrators' contracts; GitHub commits never authorize external spending by themselves.

Procurement and fiscal controls

Before purchasing: publish item rationale, measured research need, exact device SKU, dated written quote, supplier, warranty, power, shipping/tax, driver availability, alternatives including cloud rental, expected utilization and approved budget phase. Independent large-purchase approvals require at least two authorized humans once governance is constituted. Keep a private original invoice; publish safe accounting totals and equipment inventory IDs without exposing card, bank, address or security details.

Each month report budget / approved / committed / invoiced / paid / refundable, funding sources, equipment inventory, payroll burn, deliverables and risks. Preserve receipts; move dollar amounts out of the contingency category only with public variance notes and approval under grant terms. Plan lines remain PROPOSED / not quoted until updated.

Research controls

Budget change procedure

budget.json contains authoritative numeric allocations. BUDGET.md carries the same numbers with purpose and procurement context. A PR changing one must update the other and include tested sum checks: (1) line item quantities × rates sum to category totals; (2) each category total equals that category's sum across four tranches; (3) tranches total $10M, with cumulative 250K / 1M / 4M / 10M. Publish the reason for every revision and the impact on research gates and cash runway.

This public research and budget directory is stewarded in aien-architecture-mv, which coordinates the multi-repository plan. It is not a substitute for an approved fiscal sponsor, donor agreement or nonprofit compliance review.