interplane.Get Omega
Read in your language

aien-architecture-mv

Canonical architecture for the AIEN ecosystem: flows, boundaries, ADRs, and the map from design to implementation repositories.

Brought by drakestapleton

branch main Branches Tags History

aien-architecture-mv / funding / tais-2026-memory-safety / BUDGET.md

95 lines · 8341 bytes Raw Blame History Source

Full program budget — AIEN Omega memory-safety research

Status: UNFUNDED PLANNING PROPOSAL (2026-10-27). USD. All rates are illustrative unquoted estimates, not vendor-confirmed offers, staffing commitments or money already spent. Minimum viable funding $250,000, total proposed 24-month program $10,000,000. This document matches the machine-readable budget.json.

Expenditure allocation by research milestone

TranchePersonnelHardwareIndependent auditsInfrastructureContingencyIncrementalCumulative
M1 — Months 0-3$150,000$35,000$35,000$15,000$15,000$250,000$250,000
M2 — Months 4-6$500,000$115,000$65,000$45,000$25,000$750,000$1,000,000
M3 — Months 7-12$1,950,000$350,000$280,000$250,000$170,000$3,000,000$4,000,000
M4 — Months 13-24$3,990,000$735,000$540,000$435,000$300,000$6,000,000$10,000,000
Total$6,590,000$1,235,000$920,000$745,000$510,000$10,000,000$10,000,000

The $250K, $1M, $4M, and $10M figures are cumulative targets; the increments are respectively $250K, $750K, $3M, and $6M. They must not be added as if they were independent awards. No tranche is unlocked automatically.

Detailed line items

personnel — $6,590,000

Line itemQuantityUnit planning allowanceExtended costPurpose
Programming language/formal verification specialists110 person-month$18,000$1,980,000Typed memory model, compiler verification, constrained source translation
GPU compiler and runtime systems engineers104 person-month$15,000$1,560,000CUDApp, CPU/GPU ownership, buffers and cross-vendor validation
AI agent security/adversarial researchers60 person-month$16,000$960,000Tool containment, fault injection, isolation and threat models
Framework integration and test engineers52 person-month$15,000$780,000GGML, PyTorch, numerical and memory regression comparisons
OSS maintenance, release and CI engineers42 person-month$15,000$630,000Reproducible release process and upstream interoperability
Program management and research operations28 person-month$15,000$420,000Procurement, fiscal control, open reporting
Independent research fellowships26 person-month$10,000$260,000Replication and specialized methods
Subtotal$6,590,000

hardware — $1,235,000

Line itemQuantityUnit planning allowanceExtended costPurpose
Additional DGX Sparks10 system$5,000$50,000Three initial Sparks proposed; independent reproduction and destructive tests
Discrete NVIDIA GPU development systems12 system$9,000$108,000Separate CPU/device address spaces and driver coverage
Data-center NVIDIA accelerator host allowances4 system$75,000$300,000Multi-GPU isolation, subject to target support and utilization
AMD CPU and ROCm-oriented GPU workstations12 system$10,000$120,000AMD heterogeneous memory, driver and porting tests
AMD high-memory server configurations4 system$35,000$140,000Large workloads and memory pressure tests
Intel discrete GPU workstations10 system$7,000$70,000Intel memory mapping and runtime semantics
Intel accelerator server allowances4 system$40,000$160,000Larger target experiments contingent on compatibility
Shared storage, racks, network, RAM, CI servers1 lot$140,000$140,000Lab orchestration and durable reproducibility
Power, thermal, UPS, measurement and fault-injection tools1 lot$70,000$70,000Adversarial hardware testing and reliable energy readings
Spares, shipping, maintenance pool1 lot$77,000$77,000Availability, repairs and replacements
Subtotal$1,235,000

audits — $920,000

Line itemQuantityUnit planning allowanceExtended costPurpose
Formal-methods proof audits8 review$50,000$400,000External proof and trusted-computing-base scrutiny
Adversarial security/red-team audits6 review$50,000$300,000Attempt to break host/GPU/agent protections
Driver/runtime binary and source audits4 review$30,000$120,000Unsafe interfaces, memory protection and firmware boundaries
Independent experiment replication awards5 award$20,000$100,000External reproduction or falsification
Subtotal$920,000

infrastructure — $745,000

Line itemQuantityUnit planning allowanceExtended costPurpose
Rented GPU compute and experiments24 month$13,000$312,000Flexible capacity where buying hardware is premature
Power, networking and hosting24 month$7,000$168,000Running the test lab
CI artifact storage, provenance and secure observability24 month$5,000$120,000Source/build/evidence retention
Research workshops and upstream collaboration24 month$3,000$72,000Cross-project verification and dissemination
Compliance, publication, essential services1 lot$73,000$73,000Grant and research operations
Subtotal$745,000

contingency — $510,000

Line itemQuantityUnit planning allowanceExtended costPurpose
Controlled reserve1 lot$510,000$510,000Disbursed only with transparent approvals
Subtotal$510,000

Staffing and pricing assumptions

The projected total covers 422 fully loaded researcher/engineer person-months, equivalent to 17.6 average full-time positions over 24 months if the complete program is funded, with hiring staged to actual awards. Monthly allowances are placeholders including benefits, contracting cost and overhead where relevant. No named institution, external reviewer or qualified researcher is represented as already engaged. Quotes, ranges and contractual costs must replace these allowances before binding commitments.

First 90 days: minimum $250,000

Procurement decisions

The hardware allocation funds research only when an associated test plan exists. More Sparks allow replication and disruptive GPU reset tests. Discrete NVIDIA tests address memory-model assumptions that GB10 unified memory alone cannot answer. AMD and Intel are new port targets requiring development; buying the devices does not make the current GB10 CUDApp runtime compatible. Data-center-class units are ceilings conditional on confirmed software feasibility, quotations and expected use; rent or defer when sensible. Report dated SKU quotes, quantities, taxes, warranty, power and safety requirements before ordering.

Independent accountability

Publish monthly allocation-vs-paid ledgers, hardware assets, audit scopes, source SHAs, failure logs and qualification receipts. Large hardware and personnel decisions require reviewer/fiscal approval under governance. The full research program is described in RESEARCH-PLAN.md. Estimates will change as engineering evidence, procurement and reviewer availability improve; every such change must update this table and budget.json together.